5E-14 rules (Termite) Exam | Questions & 100% Correct Answers (Verified) | Latest Update | Grade A+
what must a technician have at a pretreat site? : notice of pesticide application, product labels for all pesticides, label for pretreat termiticieds. contracts covering pre-construction Soul treatments for preventive of subterranean termites shall show a warranty _____ from date of treatment as stated in 5E-14? : no less than one year in contracts covering pre-construction soil treatments for prevention of subterranean termites the property owner shall have the option of extending annually after the first year no less than an additional _____ ? : 3 years 2 | P a g e contracts covering pre-construction soil treatments for subterranean termites are not required to offer a warranty in the invent of? : the treatment area does not physically adjoin or attach to existing structures spot treatment for termites? As specified in 5E-14? : do not require a warranty 5E-14 States that a structure shall not knowingly be placed under a second contract for the same wdo control or preventative treatment in disregard of the first contract, without first obtaining _____? : written consent in letter form signed by property owner or authorized agent licensees and certified operators must maintain specimen copies of all _____ for pesticides use and their current business operations as required by 5E-14 : label
Written for
- Institution
- 5E-14 rules
- Course
- 5E-14 rules
Document information
- Uploaded on
- April 22, 2024
- Number of pages
- 3
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
5e 14 rules termite exam questions 100 cor
Also available in package deal