Asbestos Building Inspector Initial Questions and Answers 2024/2025
Asbestos Building Inspector Initial Questions and Answers 2024/2025 AHERA - CORRECT ANSWER-The Asbestos Hazard Emergency Response Act. 40 CFR Part 763, Subpart E. Started 1986 and requires that all schools, grades K-12 (nonprofit), be inspected for the presence of ACBM (asbestos-containing building material). ACBM - CORRECT ANSWER-Asbestos Containing Building Material ASHARA - CORRECT ANSWER-The Asbestos School Hazard Abatement Reauthorization Act. Started 1990, effective Nov. 1992, requires that an accredited Building Inspector perform any asbestos inspection conducted in a public or commercial building. Extended the training requirement to cover asbestos workers, supervisors, and inspectors in public and commercial buildings. ("Under the ASHARA revisions AHERA's training requirements now apply to all persons working with asbestos in public and commercial buildings...") Increased number of hours required for asbestos worker and supervisor training to 32 and 40 hrs respectively. Building Inspector Responsibilities (AHERA & ASHARA) - CORRECT ANSWER-1. Determining whether ACBM is present in a building 2. Assessing the physical characteristics of the ACBM within the building. A building inspection involves: - CORRECT ANSWER-1. Investigation of records for the identification of ACBM 2. A physical and visual inspection of the building for suspect materials 3. Sampling and analyzing suspect materials to test for asbestos 4. Assessing the condition and location of the ACBM and other characteristics of the building Management Planner Role - CORRECT ANSWER-Uses info from the building inspection to estimate the degree of current or potential hazard posed by the ACM and develop a plan for managing the ACM. After ACM is confirmed, create O&M plan, stays in effect until ACM is removed. OSHA - CORRECT ANSWER-Occupational Safety and Health Administration - Protects workers How AHERA affects your work/changed things: - CORRECT ANSWER-1. Defines ACM as being more than 1%. 2. Lays out 5 control methods: operations and maintenance, enclosure, encapsulation, repair, and removal
Written for
- Institution
- Asbestos supervisor
- Course
- Asbestos supervisor
Document information
- Uploaded on
- April 17, 2024
- Number of pages
- 6
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
- ahera
-
asbestos building inspector initial questions and
-
buildings covered under neshap and exclusions
-
osha respirator standard
Also available in package deal