Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

NCCCO CRANE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% CORRECT)

Rating
-
Sold
-
Pages
13
Grade
A+
Uploaded on
15-04-2024
Written in
2023/2024

Before leveling a mobile crane on outriggers, an operator should ensure: - ANSWER there is no weight of the crane bearing on any tires Operating a mobile crane with a long boom, on uneven ground, what support condition should be considered? - ANSWER Keeping 90 degree angle between cylinder rod and pad What is the primary purpose fir a rooster sheave or auxiliary boom point sheave? - ANSWER Separate the boom hoist lines How many randomly broken wires in a lay length must there be on a mobile cranes hoist line, before it should be removed from service? - ANSWER 6 On a mobile crane, how many broken wires are permitted at the end connection of a pendent before it must be taken out of service? - ANSWER 1 Type 1 rotation resistant hoist wire rope has a design factor of: - ANSWER 5 to 1 How many randomly distributed broken wires in rotation- resistant hoist wire rope are considered for replacement? - ANSWER 2 broken wires in 6 rope diameters The term net capacity is best defined by which of the terms listed below? - ANSWER Gross capacity minus capacity deductions Mobile cranes that are set up on barges, shall have a list chart provided by which of the entities listed below? - ANSWER Manufacturer When lifting loads on tires, mobile cranes are rated at what percentage of tipping? - ANSWER 75% How does the effective weight of a slowed extension relate to the actual weight of the extension? - ANSWER Higher than the actual weight. When load radius is between radii values, the operator must use the: - ANSWER longer radius Why should only approved attachments or extra counterweights provided by the manufacturer be placed on the rear of the crane? - ANSWER They could cause a backward stability problem. NCCCO CORE FINAL EXAM QUESTIONS AND ANSWERS LATEST UPDATE 2024/2025 (100% CORRECT) A mobile crane's jib is offset 15º versus its original 0º offset, but the boom angle remains unchanged. In this situation, the load radius: - ANSWER increases Abruptly stopping a rapid swing on a long-boom mobile crane will produce what major effect? - ANSWER Collapsing the boom. When determining the position to a mobile crane should be left in over night, when high winds in the forecast the operator should: - ANSWER Follow the manufacturers recommendations. If a mobile crane is NOT set-up level and the operator swings the load from the high side to the low side, what effect will that have on the radius? - ANSWER The radius increase. Increasing the distance from the crane's center of gravity to the tipping axis will have what effect on the mobile crane? - ANSWER Decreases stability. Backward stability of a mobile crane is tested in which configuration listed below? - ANSWER Basic boom at minimum angle with no load Deflection of the boom while operating a mobile crane will increase? - ANSWER Load Radius (Swings out) A sudden start or stop of the hoisting function while operating a mobile crane can produce a: - ANSWER dynamic load Before lifting an occupied personnel platform on a job site, which of the following applies? - ANSWER Use 50% of rated capacity, Trial lift to anticipated weight, Ensure rigging dedicated to platform only. According to OSHA 1926. 1431, while hoisting a personnel platform, what weather condition listed below will promptly discontinue the operation? - ANSWER Dangerous If working near overhead power line and using a tag line, which type of rope is least conductive to electricity? - ANSWER Polypropylene When working near power lines with the mobile crane, where does OSHA require caution stickers be installed on all equipment? - ANSWER At operators station and 2 on the outside of the equipment. According to OSHA table T, what is the minimum clearance for 133kV power lines? - ANSWER 10ft According to OSHA's table T, what clearance should a mobile crane IN TRANSIT keep while going under 445kV lines? - ANSWER 16ft According to OSHA when is it safe to hoist loads with a mobile crane below energized power lines? - ANSWER When the fully extended boom can't reach the prohibited zone. According to OSHA 1926. 1411, when you encounter power lines with a voltage of 44kV and the crane is TRAVELING, according to Table T, what is the minimum required clearance? - ANSWER 6ft According to OSHA, mobile crane load block hooks must not have a twist in excess of: - ANSWER 0 According to OSHA, mobile crane load blocks hooks must not have a throat opening in excess of: - ANSWER 5% When correctly installing U-bolt type wire rope clips, the U portion of the clip shall be on: - ANSWER the dead or short end What is the angle between the top of the load and the sling leg referred to in sling load charts? - ANSWER Horizontal sling angle When installing a wedge socket, it must be attached with the load line pulling in a straight line from the: - ANSWER pin What is the purpose of placing mats or cribbing under outrigger floats? - ANSWER Distribute the force over a larger area Where is the best location for leveling a crane? - ANSWER Upperworks When may blocking (cribbing) be placed under outrigger beams on mobile cranes? - ANSWER Never approved Mobile cranes should be level to within what percent of grade? - ANSWER 1% Timber crane mats work best when they are - ANSWER Bolted together When arriving in the crane at the job site, the operator should first determine the condition of - ANSWER access roads What surface listed below would NOT be a good location for assembly or setup of a mobile crane? - ANSWER Above underground vaults Each outrigger pad and its blocking should be sufficient to support? - ANSWER The total weight of the crane and its load How does high wind affect a mobile crane with a long boom? - ANSWER Introduces side load onto the boom When is the only time the outrigger beams should be less than fully extended? - ANSWER The load chart indicates that this is allowed. Eccentric main boom tip reeving causing which of the following: - ANSWER Twisting of the main boom Which type of wire rope listed below is installed on most cranes? - ANSWER Right regular lay The hoist drum flange shall extend a minimum of ________ over the top layer of wire rope at all times while crane is in operation. - ANSWER 1/2 inch Which of the following is classified as a standing wire rope? - ANSWER Pendant line. When lifting on outriggers the floats or pads should always be: - ANSWER Raised to touch the tires firmly on the ground.

Show more Read less
Institution
NCCCO Crane
Course
NCCCO Crane









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
NCCCO Crane
Course
NCCCO Crane

Document information

Uploaded on
April 15, 2024
Number of pages
13
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
STUDYROOM2026 Chamberlain College Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
410
Member since
3 year
Number of followers
212
Documents
3901
Last sold
2 months ago

For all Nursing Test Banks visit my page. All Papers are Verified and Graded to Score A++ Wish you Success.

3.6

63 reviews

5
22
4
14
3
14
2
4
1
9

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions