Texas Wastewater A UPDATED Test Questions And CORRECT Answers
What is TCEQ doing to control "point source" pollution of the Texas waterways? *Permitting of domestic wastewater plants *Permitting of industrial wastewater plants Describe proper design of force main wastewater lines. Minimum two fps velocity with the smallest pump operating alone. Minimum four inch diameter pipe with 150 psi rating. What is Standard Dimension Ratio? Ratio of outside pipe diameter (OD) to wall thickness (PVC) Describe proper design of gravity wastewater lines. Designed to flow half full ,under normal conditions, at a minimum of two fps and a maximum of ten fps.
Written for
- Institution
- Texas Wastewater A
- Course
- Texas Wastewater A
Document information
- Uploaded on
- April 10, 2024
- Number of pages
- 12
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
Also available in package deal