Guidewire Insurance Methodology EXAM (QUESTIONS WITH 100% CORRECT ANSWERS ) (2024 / 2025) (Verified by Experts)
Which phases in the Guidewire project lifecycle are divided into sprints - ANSWER Inception Development Stablization What is the typical duration of a sprint in the inception phases ? - ANSWER 1 week During the stabilization phase what is the purpose of performance testing ? - ANSWER Run tests to check how well the system works in anticipated and peak loads