ACI Concrete Field Testing Technician- Grade I Correct Questions & Solutions
The sensor of the temperature measuring device shall be submerged a minimum of _____ in. [_____mm] into the freshly mixed concrete. - ANSWER 3 in. [75 mm] The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete to +- _____ degrees F [+- _____ C] throughout a range of _____. - ANSWER 1 degree F [0.5 C], 30 degrees F to 120 F [0 C to 50 C] The temperature measuring device shall be calibrated _____, or whenever there is a question of _____. - ANSWER Annually, accuracy The temperature of concrete may be measured in a wheelbarrow. True or False? - ANSWER True The temperature of concrete may be measured in a wall form. True of False - ANSWER True A composite sample of concrete is required even if the only purpose for obtaining the sample is to determine temperature. True of False? - ANSWER False What must be done to the sample container prior to sampling the concrete? - ANSWER Dampen (with water) What must be done to the concrete surrounding the temperature measuring device after the device is submerged in the fresh concrete. - ANSWER Gently press the concrete around the temperature measuring device at the surface of the concrete
Written for
- Institution
- ACI Concrete
- Course
- ACI Concrete
Document information
- Uploaded on
- April 3, 2024
- Number of pages
- 11
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
- aci concrete
-
aci concrete field testing technician grade i cor
-
aci concrete field testing technician
-
the sensor of the temperature measuring device sha
-
the temperature measuring device shall have a c
Also available in package deal