ARE 5.0 - Construction & Evaluation Test with 100% Correct | Latest Updated Graded A+
Competitive bid - Can be public or private and involves more than 1 contractor Negotiated Bid - For privately funded projects, Owner and Architect work with 1 GC to reach a price Why would an Owner hire a Construction Manager as Adviser (CMa)? - To assist in project delivery by providing cost estimating, scheduling, and construction contract management services to the Owner Which project delivery limits the role and responsibilities of the Architect during preconstruction? - IPD Who is responsible for cost control in design-build delivery? - The GC (Architect is responsible for controlling cost of design services) Who must approve a proposed substitution? If approved, what is done with the proposal? - Architect. If approved, it becomes an addendum to be included in the bid documents Who is the only party who guarantees by contract all construction costs? - GC
Document information
- Uploaded on
- April 2, 2024
- Number of pages
- 34
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers