SHP final
SHP final Questions And Answers Elaborations - Which of the following steps should you always perform before removing an existing thermostat - Which step should you always take to ensure that the z wave network is aligned in the strongest manner? - Which type of hvac furnace requires a fan delay (09) Smoke detector. (09) Heat detector. (08) Freeze - Which of the following zone/sensor types are correct when programming an smkt3 1 week prior - When should you reconcile on hand equipment prior to an Inventory Audit with your FSM? 2 - How many stages of cool does a conventional A/C unit have it if has both Y and Y2 wire 2 stages - How many stages of heat does a conventional unit with a furnace have if it has not a W and W2 wire. 3/4" - When installing a dw21, what size drill bit should you use to drill the hole for the sensor 7ft - What it the correct height ar which to install the Pir2 12-24v - What is the input voltage range for a doorbell camera 12" - What is the minimum distance for placement of a co3 from the corners of the wall 16.5 - What is the output voltage of transformer used to power the sky control 100% - Per the policy, what percentage of your equipment should you carry on your truck? A Dw11 should be used on all metal doors - When installing a Dw21 into a metal door frame, with a wooden door, what should you be sure to use Always enable the emergency - When programming an skey1,you must Audible alarm (7) - When programming the emergency key for the skey1,which zone/sensor type is used. Auto orders will work properly/ you will have enough equipment for the customer. - What are 2 reasons why it is important to make sure your usage is correct? Baseboard heating PID thermostats with abc wiring radiators - Which of the following units are not compatible with Vivint thermostats Beans & wire caps - Which of the following materials can you use to group multiple ground terminals in a takeover. Between 6"(15cm) and 2'(61cm) from floor - When installing a Dw21, where is the approved location for the sensor Conventional, AC powered, 1 stage heat, 1 stage cool - Determine the Hvac setup based on the following wiring:C,B,W2,Y,Rh,G Conventional, AC powered, 2 stage cool, 1 stage heat - Determine the Hvac setup based on the following wiring:C,W,Y,Y2,Rc,G Conventional, battery powered, 2 stage cool, no heat - Determine the Hvac setup based on the following wiring:B,Y,Y2,Rh,G Ensure that all Transfers are complete Check the daily usage and submit fixes as needed Ensure that all bad equipment has been sent back and reconciled Check "In Transit" to see what is coming your way Ensure that all equipment has been received - Select all that apply: Before submitting a web order, what steps should you first take? False - As a last case scenario you can use the reconciliation tab in MTM as a "fix" for your on hand inventory numbers. False - It is not necessary when reconciling to count every part on hand. False - The smkt3 has 2 function:smoke and heat detection False - When installing a translator, you must program all of the existing sensors as new equipment on the panel False - When performing a full system test, you may bypass any open doors or windows False - When running power to the take345,polarity doesn't apply False - Your on-hand number will be correct if you physically add equipment to an account, but you do not add the equipment through the MTM or Data Entry. False - Your on-hand number will change when you create a Web Order PO. For special occasions or special parts or supplies - As lo
Document information
- Uploaded on
- April 2, 2024
- Number of pages
- 3
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers