MK1 swe|672 Questions with 100% Correct Answers | Verified | Latest Update|58 Pages
When is the cutter engineering report due? - ️️Jan 31 What type of engine is on a P100 - ️️Single cylinder air cooled four stroke How long will a P6 pump run on a tank of fuel - ️️4 hours What type of engine is on a P6 pump - ️️6.5 horsepower Honda GX-200 has engine How would you test 4-20 mA sensor - ️️In series The MPU - 23 card exhibits what color lights on the panel when operating normally - ️️Green Yellow Yellow How many digits are in a NSN - ️️13 What cut are R/G teeth? - ️️helical Oil fog out of R/G - ️️Faulty precipitator Standard hoses shall be identified as Standard in Hose Log and shall be scheduled for replacement at intervals not to exceed - ️️8 years What % hydraulic failure is due to contamination? - ️️80%
Written for
- Institution
- MK1 swe
- Course
- MK1 swe
Document information
- Uploaded on
- March 25, 2024
- Number of pages
- 58
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
Also available in package deal