Resource and Waste Management Questions And Answers With Complete Solutions
Resources on a construction project - Answer--Products and materials -Construction plant, tools and equipment -Human Resources -Space and facilities -Subcontractors -Finance Why plan for resources - Answer--Ensure resource availability and resolve resource conflicts -Optimise time, effort and cost -Ensure skilled workers are available -Identify limitations e.g site access, weather -reassign resources in response to circumstances -Track resource utilisation to avoid excessive resourcing or under utilisation What is resource management planning (RMP) - Answer--management framework that helps clients to consider and manage key resource efficiency components on projects across its life cycle What does RMP involve - Answer-The flexible process makes use of existing documents and tools to be integrated with environmental management systems -Accessible for projects at different levels of technical detail, type or size and provides evidence for environmental assessment methods such as BREEAM or CEEQUAL. Stages involved with RMP - Answer--Scoping -Action Planning -Estimating -monitoring -Reporting Scoping Stage - Answer-the resource efficiency component is analysed for the whole project so that action can be targeted on all section of the project.Resource efficiency components - Answer--reducing material consumption -waste -Re-use and recycled content -Durability and Life span -Scarcity and Security -Products with low embodied carbon and water -Reducing energy and water in construction -Operational energy and water use Action Planning Stage - Answer--Designer and principal contractor identify actions and performance measures to improve resource efficiency for components defined in the scoping stage. -Lessons from previous projects should be reviewed Monitoring Stage - Answer--Monitoring is carried out for each component by the principal contractor -Client and designer can review at this point and work with the contractor if any changes are required to improve efficiency Reporting Stage - Answer--All members of the construction team should report the performance of the project -This enables lessons to be learned, improve benchmarking and identifying good practice. -Important to how requirements for efficiency are met as well as allow for continual improvement -take lessons forward to new projects Benefits of a site waste management plan - Answer--required on projects over £300k -improve efficiency and profitability by promoting reuse, recycling and recovery of waste rather than disposal -Reduce fly tipping -Increase environmental awareness of your workforce and management Waste Hierarchy - Answer--Reuse -Recycle-Recover -Dispose
Written for
- Institution
- Resource and Waste Management
- Course
- Resource and Waste Management
Document information
- Uploaded on
- March 15, 2024
- Number of pages
- 3
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
resource and waste management
Also available in package deal