You're preparing a complete quantitative risk analysis with your project team and several subject matter experts. You gather necessary inputs, including the project's cost management plan. Why is necessary to include your project's cost management plan in preparation for quantitative risk analysis? Correct Answer-The project's cost management plan provides control that might determine a structure for quantitative analysis of the budget. Which of the following measure she project's validity? Correct Answer-Strategic alignment You're a project manager for a manufacturing firm. Your project requires installation of a specialized piece of equipment with a unique set of specifications. This equipment is a predecessor task for the project's final deliverable. This scenario is an example of which of the following? Correct Answer-Mandatory dependency You're creating a project network diagram for your organization. You need to discover which activities have no project float available. What are these activities called in your project network diagram? Correct Answer-Critical path activities In which of the following circumstances does a project closure phase occur? Correct Answer-Project completion Project cancellation
Written for
- Institution
- CompTIA
- Course
- CompTIA
Document information
- Uploaded on
- March 8, 2024
- Number of pages
- 79
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
comptia project plus use this study guide with cor
Also available in package deal