ACI Concrete Field Testing Technician- Grade I Exam Questions and Answers
ACI Concrete Field Testing Technician- Grade I Exam Questions and Answers The sensor of the temperature measuring device shall be submerged a minimum of _____ in. [_____mm] into the freshly mixed concrete. - Answer-3 in. [75 mm] The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete to +- _____ degrees F [+- _____ C] throughout a range of _____. - Answer-1 degree F [0.5 C], 30 degrees F to 120 F [0 C to 50 C] The temperature measuring device shall be calibrated _____, or whenever there is a question of _____. - Answer-Annually, accuracy The temperature of concrete may be measured in a wheelbarrow. True or False? - Answer-True The temperature of concrete may be measured in a wall form. True of False - Answer- True A composite sample of concrete is required even if the only purpose for obtaining the sample is to determine temperature. True of False? - Answer-False What must be done to the sample container prior to sampling the concrete? - Answer- Dampen (with water) What must be done to the concrete surrounding the temperature measuring device after the device is submerged in the fresh concrete. - Answer-Gently press the concrete around the temperature measuring device at the surface of the concrete How long must the temperature measuring device remain in the freshly mixed concrete? - Answer-At least 2 minutes but not more than 5 minutes After the temperature of the concrete is read, what is required? - Answer-Reporting of temperature The temperature of concrete is reported to the nearest _____ degrees F [_____ C] - Answer-1 degree F [0.5 C] According to ASTM C1064, what is one reason to take the temperature of concrete? - Answer-Verify conformance to a specified requirement for temperature of concrete A maximum temperature of freshly mixed concrete is specified in ASTM C1064. True of False? - Answer-False The sample of concrete used for temperature determination must be rodded 25 times. True or False? - Answer-False Sampling by this method is required when tests are to be made to determine _____ with specification requirements. - Answer-Compliance This method covers sampling from four types of mixtures which are _____, _____, _____, and _____. - Answer-Stationary mixers, paving mixers, revolving drum mixers, and open top mixers The maximum allowable time between obtaining the first and final portions of a composite sample is _____ minutes. - Answer-15 Portions of a composite sample shall be thoroughly remixed bfore beginning tests on the sample. True of False? - Answer-True
Written for
- Institution
- ACI
- Course
- ACI
Document information
- Uploaded on
- March 1, 2024
- Number of pages
- 15
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
aci concrete field testing technician grade i exa
Also available in package deal