100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

CATEGORY 3 NON-CAB OPERATED TEST 2024/2025 already graded A+

Rating
-
Sold
-
Pages
6
Grade
A+
Uploaded on
29-02-2024
Written in
2023/2024

CATEGORY 3 NON-CAB OPERATED TEST 2024/2025 already graded A+

Institution
GENERAL CRANE SAFETY
Course
GENERAL CRANE SAFETY









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
GENERAL CRANE SAFETY
Course
GENERAL CRANE SAFETY

Document information

Uploaded on
February 29, 2024
Number of pages
6
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • general crane safety

Content preview

CATEGORY 3 NON-CAB OPERATED
TEST

Bridge cranes with rated capacities of 20,000 lbs. or greater are classified as ______ cranes -
ANSCategory 2

The expiration date that is of particular importance to crane operators is - ANSThe certification
expiration date of the crane

Who is primarily responsible for evaluating a Crane Operators physical and emotional fitness -
ANScrane operator

A monorail hoist with less than 20,000 lbs. capacity is a ________________ crane. -
ANSCategory 3

Components that control, restrain, or position the load, and upon failure would cause dropping,
shifting or uncontrolled movement of the loads are ____________. - ANSload controlling parts

All of the following require a license to operate EXCEPT a: - ANSNon-cab operated category
3-bridge crane

What is two-blocking and why is two-blocking dangerous? - ANSTwo-blocking occurs when the
hook block comes in contact with the upper sheave block during hoisting of the hook. It is
dangerous because it could result in damage to the crane, parting of the hoist lines, and
dropping the load.

The formula for determining the area of a triangular shaped object is: - ANSBase x Height
divided by 2

When are operators required to perform a pre-use check of the crane? - ANSPrior to the first
use of the crane each day.

Regardless of the method of communication used all crane signals must be
____________________. - ANSclear

Synthetic web slings should NOT be used in areas where temperatures exceed 194 degrees
Fahrenheit. - ANSTrue

If an object is 6 feet long, 5 feet wide, and 4 feet high, what is the volume of the object? -
ANS120 cubic feet

, Is it necessary for the operator to see the load or work area? - ANSNot if there is a designated
signal person who is in control of the lift and is in view of the operator, or if the signal giver is in
constant radio contact with the operator.

What is "inching"? - ANSPerforming a motion very slowly, a little at a time

The majority of crane accidents are attributed to which of the following? - ANSPersonnel error

Crane operators at naval activities may be required to operate various types of cranes for which
they hold a license. Which of the following can best assure operator proficiency and safety? -
ANSBe familiarized by a qualified person before operating the crane for the first time

Which of the following is NOT an acceptable method of communication between the signal
person and the crane operator? - ANSSignal Flags

Which of the following is used with a physical locking device placed at the energy source? -
ANSLockout Tag

Which of the following is considered to be the best way the operator can ensure the crane is
safe to operate on any given day? - ANSPerform Daily Pre-use Checks

When crane accidents happen, you must do all of the following EXCEPT: - ANSContinue to
operate the crane until all lifts are completed

Components that provide protection for operation and maintenance personnel working on or in
the path of cranes. - ANSGeneral Safety Devices

If the crane operator and the rigger in charge disagree on whether or not a load is safe to lift the
operator should: - ANSnot operate the crane until contacting the supervisor to resolve the issue.

Components that support the load, and upon failure would cause dropping or uncontrolled
lowering of the load are ____________. - ANSload bearing parts

What is meant by "skewing"? - ANSWhere one end of the bridge gets ahead of the other end,
frequently causing binding on the rails.

What are the principal parts of an overhead traveling crane? - ANSBridge girders, end trucks,
trolley, and operator's cab or pendant control

Why shall sudden starts and stops of the bridge and trolley be avoided? - ANSSudden starts
and stops could cause the trolley or bridge to derail

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Ashley96 Howard Community College
View profile
Follow You need to be logged in order to follow users or courses
Sold
587
Member since
2 year
Number of followers
198
Documents
5001
Last sold
3 days ago

In my page you will find all latest Exams , with Questions and Answers, package deals, etc. I upload quality. Instant delivery. You will get solutions to all subjects in both assignments and major exams. Contact me for any assistance. Good Luck!!!

4.0

149 reviews

5
82
4
21
3
25
2
6
1
15

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions