ISA Utility Specialist (Ch. 6: Storm Preparation & Response) 48 Questions with 100% Correct Answers | Verified | Updated 2024
Crew mobilization Major storms or __________ weather events are the usual cause of power outages over large areas. - ️️catastrophic for a storm event is much more rapid from a __________ status. - ️️standby Voluntary safety standards for pruning, trimming, repairing, maintaining & removing trees, & cutting brush: - ️️ANSI Z133 On a storm site, cutting should not begin until all risks have been assessed & the __________ approach has been decided & adopted. - ️️safest As clearance work progresses, __________ between crews & dispatcher is critically important to determine locations of downed or damaged lines. - ️️communication One of the highest personal risks in a storm is __________. - ️️fatigue Always consider that all lines are __________. - ️️energized The sound of a running home generator should alert crews to the possibility of __________. - ️️backfeed Crew members should always refer customer relations questions about the status of power restoration to: - ️️the utility
Written for
- Institution
- ISA Utility Specialist
- Course
- ISA Utility Specialist
Document information
- Uploaded on
- February 16, 2024
- Number of pages
- 6
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers