ACI Concrete Field Testing Technician- Grade I Exam Questions with 100% Correct Answers | Latest Updated 2024
ACI Concrete Field Testing Technician- Grade I Exam Questions with 100% Correct Answers | Latest Updated 2024 The sensor of the temperature measuring device shall be submerged a minimum of _____ in. [_____mm] into the freshly mixed concrete. - Answer ️️ -3 in. [75 mm] The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete to +- _____ degrees F [+- _____ C] throughout a range of _____. - Answer ️️ - 1 degree F [0.5 C], 30 degrees F to 120 F [0 C to 50 C] The temperature measuring device shall be calibrated _____, or whenever there is a question of _____. - Answer ️️ -Annually, accuracy The temperature of concrete may be measured in a wheelbarrow. True or False? - Answer ️️ - True The temperature of concrete may be measured in a wall form. True of False - Answer ️️ -True A composite sample of concrete is required even if the only purpose for obtaining the sample is to determine temperature. True of False? - Answer ️️ -False What must be done to the sample container prior to sampling the concrete? - Answer ️️ - Dampen (with water) What must be done to the concrete surrounding the temperature measuring device after the device is submerged in the fresh concrete. - Answer ️️ -Gently press the concrete around the temperature measuring device at the surface of the concrete How long must the temperature measuring device remain in the freshly mixed concrete? - Answer ️️ -At least 2 minutes but not more than 5 minutes After the temperature of the concrete is read, what is required? - Answer ️️ -Reporting of temperature The temperature of concrete is reported to the nearest _____ degrees F [_____ C] - Answer ️️ - 1 degree F [0.5 C] According to ASTM C1064, what is one reason to take the temperature of concrete? - Answer ️️ -Verify conformance to a specified requirement for temperature of concrete A maximum temperature of freshly mixed concrete is specified in ASTM C1064. True of False? - Answer ️️ -False The sample of concrete used for temperature determination must be rodded 25 times. True or False? - Answer ️️ -False Sampling by this method is required when tests are to be made to determine _____ with specification requirements. - Answer ️️ -Compliance This method covers sampling from four types of mixtures which are _____, _____, _____, and _____. - Answer ️️ -Stationary mixers, paving mixers, revolving drum mixers, and open top mixers The maximum allowable time between obtaining the first and final portions of a composite sample is _____ minutes. - Answer ️️ -15 Portions of a composite sample shall be thoroughly remixed bfore beginning tests on the sample. True of False? - Answer ️️ -True The maximum elapsed time allowed between obtaining the final portion of the composite sample and beginning the tests for slump, temperature, and air content is _____ minutes. - Answer ️️ - 5 The molding of strength test specimens shall begin within _____ minutes after fabricating the composite sample. - Answer ️️ -15 The concrete sample must be protected from contamination and _____. - Answer ️️ -Rapid evaporation The minimum size sample for making strength test specimens is _____. - Answer ️️ -28 L (1ft^3
Written for
- Institution
- ACI Concrete
- Course
- ACI Concrete
Document information
- Uploaded on
- February 15, 2024
- Number of pages
- 10
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
aci concrete field testing technician grade i exa
Also available in package deal