ACI Concrete Field Testing Technician - Grade I Exam with complete solutions | Latest Update 2024
ACI Concrete Field Testing Technician - Grade I Exam with complete solutions | Latest Update 2024 The temperature of concrete may be measured in a wall form. True or False - Answer ️️ -True The sensor of the temperature measuring device shall be submerged a minimum of _____ in. into the freshly mixed concrete. - Answer ️️ -3 in. Portions of a composite sample shall be thoroughly remixed bfore beginning tests on the sample. True or False? - Answer ️️ -True The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete to +- _____ degrees F [+- _____ C] throughout a range of _____. - Answer ️️ - 1 degree F, 30 degrees F to 120 F The temperature measuring device shall be calibrated _____, or whenever there is a question of _____. - Answer ️️ -Annually, accuracy The temperature of concrete may be measured in a wheelbarrow. True or False? - Answer ️️ - True A composite sample of concrete is required even if the only purpose for obtaining the sample is to determine temperature. True or False? - Answer ️️ -False What must be done to the sample container prior to sampling the concrete? - Answer ️️ - Dampen with water What must be done to the concrete surrounding the temperature measuring device after the device is submerged in the fresh concrete. - Answer ️️ -Gently press the concrete around the temperature measuring device at the surface of the concrete How long must the temperature measuring device remain in the freshly mixed concrete? - Answer ️️ -At least 2 minutes but not more than 5 minutes After the temperature of the concrete is read, what is required? - Answer ️️ -Reporting of temperature The temperature of concrete is reported to the nearest _____ degrees F - Answer ️️ -1 degree F According to ASTM C1064, what is one reason to take the temperature of concrete? - Answer ️️ -Verify conformance to a specified requirement for temperature of concrete A maximum temperature of freshly mixed concrete is specified in ASTM C1064. True or False? - Answer ️️ -False This method covers sampling from four types of mixtures which are _____, _____, _____, and _____. - Answer ️️ -Stationary mixers, paving mixers, revolving drum mixers, and open top mixers The maximum allowable time between obtaining the first and final portions of a composite sample is _____ minutes. - Answer ️️ -15 The maximum elapsed time allowed between obtaining the final portion of the composite sample and beginning the tests for slump, temperature, and air content is _____ minutes. - Answer ️️ - 5 The molding of strength test specimens shall begin within _____ minutes after fabricating the composite sample. - Answer ️️ -15 The concrete sample must be protected from sources of _____ and _____. - Answer ️️ - contamination and rapid evaporation The minimum size sample for making strength test specimens is _____. - Answer ️️ -1ft^3 When sampling from a stationary mixer, the batch must be sampled at _____ or more regularly spaced intervals during discharge of the middle portion of the batch - Answer ️️ -2 The composite sample for a paving mixer must represent a minimum of _____ different portions of the batch of concrete taken from the pile after discharge. - Answer ️️ -5 When sampling from a revolving drum truck mixer, concrete must be sampled at a minimum of _____ regularly spaced intervals during discharge of the middle portion of this batch. - Answer ️️ -2
Written for
- Institution
- ACI Concrete
- Course
- ACI Concrete
Document information
- Uploaded on
- February 15, 2024
- Number of pages
- 9
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
aci concrete field testing technician grade i ex
Also available in package deal