BECC MOD 4 questions and answers latest top score.
BECC MOD 4 questions and answers latest top score. What fittings are secured for CBR defense? - correct answer. Circle William What condition of readiness is used when the ship is in NO danger? - correct answer. X-ray The maximum length of time that a fitting may be logged open is ....... - correct answer. 24 hours. The backbone of a ship is referred to as the ....... - correct answer. keel. Compartments located completely on the Starboard side of the centerline are assigned ....... numbers as the third digit in a compartment number. - correct answer. odd The lettering on a compartment BULL'S EYE is ....... inches tall? - correct answer. 2 Primary monitoring of the firemain system is conducted from ....... - correct answer. Damage Control Central Which type of fire main system is located near the centerline of the ship that extends forward and aft on the damage control deck to supply the required fire main services? - correct answer. Single Main What is the proper sequence to align an installed eductor for operation? - correct answer. Discharge valve, fire main actuation valve, bilge suction valve Which drainage system runs through the main machinery spaces on a Navy ship? - correct answer. Main (True/False) To prevent possible flooding in the compartment, the bilge suctions must be closed at all times when NOT in use. - correct answer. True The team responsible for exposed ordinance is the ....... team. - correct answer. Ordinance Disposal (True/False) The team that handles all damage caused by collisions is the Crash and Salvage Team. - correct answer. False Removal of water from flooded compartments, is the responsibility of the ___ team - correct answer. De watering In the event that Damage Control Central is lost due to battle damage, which repair party would assume the duties as back up Damage Control Central? - correct answer. Most remote repair locker (True/False) The Damage Control Repair Station responsible for re-manning the main space(s) is Repair Five. - correct answer. True The Main Deck Repair party is repair ....... - correct answer. 1. Which Damage Control party is only on air capable ships? - correct answer. Crash and Salvage Team The person that is in charge of clearing routes to provide access to fires is the ....... - correct answer. Access Man. Who sets and maintains the boundaries, and removes and relocates flammables? - correct answer. Boundary man "Unexploded munitions" signs will be found in the ....... repair locker kit? - correct answer. CBR Monitoring (True/False) The extra plugging and patching repair kits are inventoried and maintained by the personnel assigned to the engineering spaces. - correct answer. True Freeboard is a measurement of distance from the ....... - correct answer. waterline to the main deck Roll - correct answer. Port to starboard (True/False) Investigators must use message blanks to write down damage that has occurred. - correct answer. True In case of fire, the proper way to investigate is by moving the back of an ungloved hand along the watertight fitting ....... inch(s) away and feel for heat. - correct answer. 1/2 The four principles of investigation are ....... - correct answer. Cautious, thorough, report, repeat. When a DC diagram is color coded blue, it indicates ....... - correct answer. decontamination stations. To find the location of a bulkhead terminal you would refer to a ....... system diagram. - correct answer. casualty power The X50J circuit is the ....... circuit. - correct answer. fog foam AFFF The X40J circuit is the ....... circuit. - correct answer. casualty communication How many sections are on the Rapid Plotting Message Blank? - correct answer. 5 What is the symbology for class "A" engaged? - correct answer. A with a Circle around it The Gas Free Certificate requires recertification every ....... hours or less. - correct answer. 8 (True/False) The minimum time that a fire watch needs to remain on station after a completion of a hot work operation is 30 minutes. - correct answer. True What is the first step in securing the Portable Exothermic Cutting Unit (PECU) in an emergency? - correct answer. Release the torch oxygen lever What holds the PECU rod in the torch assembly? - correct answer. Collet nut and chuck What type of closure is secured using a single lever or hand wheel, which operates all dogs simultaneously? - correct answer. QAWTD What should be used to clean gasket material on a watertight door? - correct answer. Clean rag What contains maintenance requirements pertaining to all equipment in a command? - correct answer. PMS Master File What portion of the PMS Master File provides the work center supervisor a ready reference of planned maintenance requirements? - correct answer. Work Center PMS Manual Requirements for storage of hazardous material is found on the ....... - correct answer. MSDS. Which of the following does NOT require eye protection? - correct answer. Normal operation of a lube oil system A Dial indicator may be used to ....... - correct answer. align machinery. It is NOT safe to operate electrical power tools in area where ....... are present. - correct answer. flammable gases What fitting must have the commanding officers permission to open? - correct answer. Circle Zebra What fittings are open and operating regardless of the material condition of readiness? - correct answer. William
Document information
- Uploaded on
- February 7, 2024
- Number of pages
- 8
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers