NERC Balancing, Interchange & Transmission Operator Exam Questions With Correct Answers
If a Balancing Authority cannot comply with the Control Performance or Disturbance Control Standards, it shall implement what remedies to do so? (EOP-002 R6) - Answer Load all available Generating Capacity Deploy all Available Operating Reserves Interrupt interruptible loads & Exports Request emergency assistance from other BA's Declare an EE through it's RC Reduce load If a BA cannot comply with CPS and DCS and has implemented all remedies but is still energy deficient what should it do? EOP-002 R6 - Answer Manually Shed Load without delay to return it's ACE to Zero When an EEA is declared who is notified and by who? - Answer Balancing Authorities and TP's are notified by the RC.
Written for
- Institution
- NERC
- Course
- NERC
Document information
- Uploaded on
- January 20, 2024
- Number of pages
- 1
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
- nerc stuvia
-
nerc balancing interchange transmission operato
-
if a balancing authority cannot comply with the co
-
if a ba cannot comply with cps and dcs and has imp
Also available in package deal