NERC Certification Practice Questions With Correct Answers
Which of the following represents a virtual tie-line updated in real time? - Answer pseudo-tie Balancing Areas shall analyze forecasted generation availability and reserve levels, and inform their reliability coordinators of actual or potential generation deficiencies each: - Answer day Balancing authorities that share jointly owned generation must include their share of the unit governor droop response into their respective frequency bias setting if the energy is scheduled as a: - Answer dynamic schedule A balancing authority's frequency bias contribution is 30 MW / 0.1 Hz. What is the balancing authority's frequency response due to the external loss of 1,000 MW generator which causes system frequency to decline to 59.95 Hz? - Answer 15 MW
Written for
- Institution
- NERC
- Course
- NERC
Document information
- Uploaded on
- January 20, 2024
- Number of pages
- 1
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
nerc certification practice stuvia
-
nerc certification practice questions with correct
-
which of the following represents a virtual tie li
-
balancing areas shall analyze forecasted generatio
Also available in package deal