AAAE CM Module 2 Exam With 100% Correct Answers 2023
NPIAS - Correct answer-Federal plan for airports, addresses development and planning on projects eligible for AIP. State Aviation System Plans - Correct answer-more detailed on how airports within a state can meet states needs Metropolitan or Regional System Plans - Correct answer-more specific indexable and consider capacity, intermodal access and local travelers Airport Areas - Correct answer-Airside, Landside Landside - Correct answer-intermodal access,parking, rental cars ticketing, bag claims, etc Airside Areas - Correct answer-Runways, taxiways, fence, etc. ALP-Grant Assurance 29 - Correct answer-requires ALP be updated at all times, shows land, terminal and facilities. protection zones, approach areas, proposed development and unusual design features ALP Contents - Correct answer-Standard ALP contains following: 1 Cover sheet-signature blocks, and location maps 2 ALP Sheet-data of existing and fyture airfield layout 3 Airport Layout Drawing 4 Airport Airspace Drawing-intended to show imaginary surfaces 5 Inner Portion of Approach Drawing-profile view of runway approaches and obstructions and surfaces associated with the Terminal Instrment Procedures (TERPS) 6 Terminal Area Drawing-and plan depicting terminal and surrounding facilities and heights. lighting and obstructions, also highway routes to and from airport and main business district 7 Land Use Drawing-on Airport and off airport depicting existing and recommended use of all land with property line to at least the 65 DNL noise contours 8 Runway Departure Surfaces Drawing-depicts available departure surfaces 9 Airport Property Map-how tracts were acquired and easements, termed EXHIBIT A on AIP grant applications 10 Data sheet-airport and runway data tables and wind rose(diagram showing percentage of time wind blows from a direction and speed) 11. Facilities layout-exisisting and future facilities 12 Utilities drawing-location and capacity of utilities13 Airport access plan-major routes and modes of transportation that serve airport ALP is signed by FAA making it a legal document, drawings typically done with computer design software that link features on map with Geographic Information Systems (GIS), FAA uses eALP which allows sharing ALP data 5 Primary Functions of ALP - Correct answer-1 FAA approved plan required to receive AIP and PFC funding 2 blueprint for airport development 3 public document that serves as a record of aeronautical requirements 4 enables FAA and Sponsor to plan for future improvements 5 working tool for staff, Notice of Propsed Construction or Alteration-FAA StNdard Form SF-7460-1 - Correct answer-notification of construction or alteration has to be given 30 days in advance Notice of Landing Area Proposal-Form SF-7480-1 - Correct answer-notification of activation or alteration of a landing area ALP - Correct answer-ALP should be Reviewed and Vaidated every 2-7 years. Necessary when existing ALP cannot accommodate forecast needs or meet design standards Grant Assurance Requirements for ALP - Correct answer-1 Property lines 2 location and nature of existing and proposed facilities (ie. runways, taxiway, parking lots) 3 existing and proposed non-aviation areas and improvements (ie. parking lots, access roads, water retention ponds) ALP Approval - Correct answer-FAA approves that ALP must be Safe, Useful and Efficient. ALP must be submitted at Airports District Office (ADO) Safe - Correct answer-safe operation of aircraft Useful - Correct answer-make best use of airport land while minimizes impact of offairp
Written for
- Institution
- AAAE CM Module
- Course
- AAAE CM Module
Document information
- Uploaded on
- January 16, 2024
- Number of pages
- 26
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
aaae cm module 2 exam with 100 correct answers 20