Transmission Test Bank 2024/2025 updated Questions And Answers 100% correct Verified
When a system is in an island, how much load needs to be shed to compensate for a 1 Hz deviation in frequency? Three to Five percent Six to Ten percent One to Two percent Ten to Twelve percentSix to Ten percent. EOP-011 requires Balancing Authorities and Transmission Operators to develop Operating Plans, that include load shed. The NERC Electric System Restoration Reference Document states, "In an islanded area, generation and load should be adjusted in small increments to minimize the impact on frequency. As a general rule, shed 6 to ten percent of load to restore the frequency approximately 1 Hz." During a system emergency, the System Operator can direct other Transmission Operators and Balancing Authorities to violate which limit? None. Equipment parameters should be maintained within their established limits Available Transfer Capacity Interconnection Reliability Operating Limit System Operating LimitNone. Equipment parameters should be maintained within their established limits
Written for
- Institution
- BANK
- Course
- BANK
Document information
- Uploaded on
- January 14, 2024
- Number of pages
- 44
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
transmission test bank updated questions
Also available in package deal