ACQ 1010 Module 3 Exam_Defense Acquisition System ALREADY GRADED A+ (LATEST VERSION
ACQ 1010 MODULE 3 EXAM: DEFENSE ACQUISITION SYSTEM What decision authorizes entry into the Production and Deployment phase? Answer: Milestone C decision Before a project enters the TMRR phase, the AoA must be completed and the Acquisition Strategy (AS) is approved by the MDA. Answer: True The Acquisition Strategy (AS) is: Answer: Prepared by the Program Manager (PM) during the Materiel Solution Analysis Phase (MSA) and is submitted to the Milestone Decision Authority (MDA) at Milestone A When is the Acquisition Program baseline (APB) prepared? Answer: Prepared at program initiation and revised to subsequent milestone reviews, program restructuring, or unrecoverable deviations What authorizes entry into the Engineering and Manufacturing Development (EMD) phase? Answer: Milestone B decision What authorizes entry
Written for
- Institution
-
National Defense University
- Course
-
ACQ 1010
Document information
- Uploaded on
- December 18, 2023
- Number of pages
- 3
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
- acq 1010
-
acq 1010 module 3 examdefense acquisition system