CDT EXAM Q & A 100% CORRECT. payment bonds - CORRECT ANSWER-They are usually issued by contractors. The payment bond is referred to as the labor and material payment bond. They are used to guarantee that subcontractors and material suppliers will pay. The payments bounds. Contract bond is known as contract bond, and they are issued by an insurance company or bank to guarantee completion of the project by the contractor. Who acquires and pays for the building permit? - CORRECT ANSWER-The contractor Life cycle - CORRECT ANSWER-The life cycle of a facility, from concept through construction to use and eventual deconstruction (demolition), follows a number of stages: Project conception, project delivery methods, design, construction documents, bidding/negotiating/purchasing, construction, and facility management. Life cycle - CORRECT ANSWER-Includes, planning, construction, evaluation, demolition During the Planning/Pre-Design Phase, the A/E may be retained to: - CORRECT ANSWER-Assist in financial feasibility studies Planning/Pre-Design Phase - CORRECT ANSWER-Project conception is often a creative stage for the owner; it requires a clear understanding of project values and goals which become the basis of many decisions. A facility program documents these decisions, resulting in a framework for future design decisions, operational procedures, and determining project feasibility. During which project phase does the A/E review the owner's program and budget requirements and suggest alternative approaches? - CORRECT ANSWER-Design In which phase are the specifications produced? - CORRECT ANSWER-Design PhaseConstruction Documents The Construction Phase begins... - CORRECT ANSWER-When the agreement is executed The Design Phase includes - CORRECT ANSWER-Surveys ,Design Development, Schematic Design,Bid Security The specification type document prepared during the Design Development phase is called the: - CORRECT ANSWER-Outline Specification What activities take place in the planning/pre-design phase? - CORRECT ANSWERFeasibility studies and budget is set Which phase fixes and describes the size and character of the entire project? - CORRECT ANSWER-Design Phase - Design Development Phase Whose responsibility is it to produce the shop drawings? - CORRECT ANSWER-The Contractor articles in PART 1 - CORRECT ANSWER-References and related documents, summary, Definitions, Submittals and procedures , Sequencing and Scheduling, transmital. Part 1 general - CORRECT ANSWER-Describes administrative, procedural, and temporary requirements unique to the section. PART 1 is an extension of subjects covered in Division 01 and amplifies information unique to the section. Project/Site Conditions - CORRECT ANSWER-Existing conditions that affect the application of other materials,Limitations such as temperature or weather that affect proper installation, An example of a level three section is: - CORRECT ANSWER-052150 Open Web Steel Joists Division numbers are fixed, but specification section numbers and titles: - CORRECT ANSWER-Are fixed for level two and three sections but can be individually selected for level four sections How many Divisions were found within the MasterFormat System until 2004 and how many exist now? - CORRECT ANSWER-16-50 In what part of the SectionFormat is found information on submittals? - CORRECT ANSWER-Part 1, General MasterFormat is based on: - CORRECT ANSWER-A six-digit numbering system MasterFormat is organized in such a way that a specification section could be written at: - CORRECT ANSWER-One of four levels of complexity Section 062210 Millwork would be considered a: - CORRECT ANSWER-Level two section The document recommended to organize preliminary construction information into a standard order on the basis of elements or systems is: - CORRECT ANSWERUniFormat The third part of the Three-Part Section Format is: - CORRECT ANSWER-Execution Under PART 3 EXECUTION, all of these statements apply EXCEPT: - CORRECT ANSWER-Include actions that actually accomplish the work What are the three parts of the SectionFormat? - CORRECT ANSWER-General, Products, and Execution What information is found within Division 13 in the MasterFormat System? - CORRECT ANSWER-Specialty Construction What would be an example of data filing with the MasterFormat System? - CORRECT ANSWER-SpecData ,Sweet's Catalog,Product literature When is the CSI/CSC UniFormat used? - CORRECT ANSWER-In the planning stage of a project When is the MasterFormat used? - CORRECT ANSWER-When organization of detailed construction is required on the basis of materials or methods Which organizational system is used in the preliminary stages of a project? - CORRECT ANSWER-UniFormat Who developed the first formal UniFormat? - CORRECT ANSWER-The CSI , The AIA , The General Services Administration Whose responsibility is the maintenance of the revised UniFormat? - CORRECT ANSWER-The CSI & The CSC Addenda are - CORRECT ANSWER-Changes to the contract documents before the agreement is signed. As part of the __________, the Agreement is considered a Contract Document: - CORRECT ANSWER-Contract Forms EJCDC N-122 is a document which - CORRECT ANSWER-Is also called A521 by the AIA,Is used to coordinate between construction documents, Suggests the primary location for specific information in the construction documents. For engineering projects, an Architect serves as a consultant to the Engineer: - CORRECT ANSWER-Sometimes. In 1964, the term "Project Manual" was introduced by the: - CORRECT ANSWERAmerican Institute of Architects On most projects, all of the following are principal entities: - CORRECT ANSWERContractor,Owner,Architect/Engineer Procurement (Bidding) documents are - CORRECT ANSWER-Defined as all the construction documents issued to bidders before the signing of an owner-contract agreement. Project specifications should be directed to which of the following: - CORRECT ANSWER-The Contractor. The Conditions of the Contract include - CORRECT ANSWER-The General Conditions, The Supplementary Conditions. The Contract Documents include - CORRECT ANSWER-The conditions of the contract, the drawings and specifications The Contract Forms include - CORRECT ANSWER-The agreement,The performance and payment bonds, The certificates. The Procurement (Bidding) Documents include all of the following - CORRECT ANSWER-Project Manual, Procurement (Bidding) Requirements,Drawings, Addenda The Procurement (Bidding) Requirements include - CORRECT ANSWER-The instruction to bidders, the invitation to bid and the bid form. The Project Manual Concept - CORRECT ANSWER-Provides an organizational format and standard location for all documents involved. The general clauses that establish how the project is to be administered are known as: - CORRECT ANSWER-General Conditions. The procurement (bidding) requirements are - CORRECT ANSWER-a part of the construction documents, but not the contract documents. The term "Contract Documents" typically includes: - CORRECT ANSWER-Contract Forms, Drawings, Specifications. What are the three components of project design team coordination? - CORRECT ANSWER-Organization, Execution and Quality Assurance. A cost-plus-fee may include: - CORRECT ANSWER-Cost of material plus an additional fee for overhead and profit,A guaranteed maximum price, Shared savings, Incentives for early completion. A disadvantage of using standardized agreement forms is: - CORRECT ANSWER-May not meet specific project requirements. A unit price contract is used when: - CORRECT ANSWER-Extent of work cannot be fully determined or where actual quantities cannot be accurately calculated. Direct selection or negotiated contract method: - CORRECT ANSWER-Usually is used by the Owner with advice from the A/E. For public sector projects, which method is normally followed for contract award? - CORRECT ANSWER-Competitive bidding. In a Design/Build project, there is a contractual relationship established between: - CORRECT ANSWER-The Owner and single party; typically a Contractor associated with the A/E. In competitive bidding - CORRECT ANSWER-Bidding is open to any bidder demonstrating the financial ability to perform the work. In the single-prime contract situation, the Owner has a contractual relationship with which of the following: - CORRECT ANSWER-Contractor and A/E In the Multiple Prime Contract - CORRECT ANSWER-The A/E will prepare a separate set of bidding documents for each contract. Lump Sum Contracts - CORRECT ANSWER-Are the simplest method of stating the cost of an entire contract. Multiple-prime contracts are normally a part of: - CORRECT ANSWER-Fast track construction The Agreement: - CORRECT ANSWER-Defines relationships and obligations between the Owner and the Contractor. The Construction Manager is normally hired by: - CORRECT ANSWER-The Owner The Single Prime Contract - CORRECT ANSWER-Is the most common form of construction contract The construction agreement is - CORRECT ANSWER-Part of the contract documents which defines the relationships and obligations that exist between the owner and contractor. The construction subcontracts - CORRECT ANSWER-Are the contracts between the contractor and the subcontractors The contractual relationship governed by the Conditions of the Contract is between: - CORRECT ANSWER-Owner and Contractor.

Show more Read less
Institution
CDT
Course
CDT









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CDT
Course
CDT

Document information

Uploaded on
November 7, 2023
Number of pages
13
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$8.59
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller
Seller avatar
SpectraLearning
5.0
(1)

Get to know the seller

Seller avatar
SpectraLearning NURSING
View profile
Follow You need to be logged in order to follow users or courses
Sold
8
Member since
2 year
Number of followers
4
Documents
449
Last sold
4 months ago
The Education Revolution

W have launched our assignments at a very reasonable price so that every student can enjoy its features. Our new method is gathering quite a positive feedback from the students, and many of our alumnus are fully satisfied with it.

5.0

1 reviews

5
1
4
0
3
0
2
0
1
0

Trending documents

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions