Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 33 pages
Exam (elaborations)

Nyc high pressure boiler license| 359 questions| with complete solutions| verified.

Document preview thumbnail
Preview 4 out of 33 pages

Nyc high pressure boiler license| 359 questions| with complete solutions| verified.

Content preview

Nyc high pressure boiler license| 359
questions| with complete solutions|
verified.
The minimum blowdown for a spring loaded safety valve shall be
of what percent of set pressure? - -10%

-How is the main steam pressure gages tested? - -With an
inspectors gage

-Who is in charge of the code for any plumbing installations? - -
The nyc plumbing code

-When will anchorage or guides be inspected? - -Annually

-How many brass washout plugs does a miniature boiler have? - -
3 brass washout plugs, 1" in size

-How often is HP piping expansion joints inspected? - -Weekly

-How long should a hydronic system be pressure tested for? - -2
hours at no less than 100 psig

-How is a gage protected from excessive pressure? - -Shut off
cock

-Who is authorized to witness a test on a gas piping system? - -
Plumbing inspector, architect, licensed PE, master plumber,
agency by the DOB

-How should a remote disconnect be labeled? - -Remote control
for burner

,-When is a fusible plug not needed to be installed on a boiler? - -
Over 200 psig

-When shall a power boiler with a MAWP over 400 be tested? - -
Pressure tested annually

-What shall a design plan of a boiler and application contain but
not limited to? - -Size, location, operating pressure + temperature
of the pressure vessel and type + specs of PRV

-Who is responsible for maintaining the copies of the certified
welder qualifications report? - -The welding agency and shall be
available to the DOB

-Who needs to furnish a control diagram and boiler operation
instructions? - -The installer

-Who will certify and calibrate all gages utilized for testing? - -A
testing operator

-What shall be placed in between different joints and piping
material? - -An approved adapter fitting

-What items are exempt from the reporting requirements? - -The
seal welds of the tubes and the installation of back rings to man
holes and hand holes to boilers

-Who will be under control for any welding done to a high
pressure tank? - -An engineer supervising a welding inspection
agency acceptable to the DOB

-At what pressure is it requires to have extra heavy valves
installed? - -100 psig

,-The ______ files an application for a boiler alteration? - -Inspector

-How many safety valves does a boiler have with over 500
square feet of heating surface? - -2

-Gas fired boilers not exceeding 100 square feet of heating
surface shall be provided with a? - -Single or double cone type of
hood diverter in the stack

-A heater for either liquid fuels or other liquids harmful to the
boiler shall not be installed? - -Directly in the steam or water
space within the boiler

-Who is responsible for any spatial relationship between tanks
and gas services? - -The installer of the last installation to correct
a violation

-Who is responsible for the setting of operating and safety
controls? - -The Installing Company

-With what safety fitting shall you protect high pressure steam
and water boilers with? - -Dual low water cut outs

-Spring loaded safety valves have a total combined relieve
capacity of? - -100% of the max designed capacity of the boiler

-What is the total combined relieving capacity of power actuated
relieving valves? - -No less the 10% of the MAWP or no higher
then 20% above the MAWP

-What is the minimum blowdown for a spring loaded safety
valve? - -2%

, -When a boiler is derated what changes? - -The MAWP decreases
and the BTU output

-In hydronic piping systems where shall a shutoff valve be
installed? - -Before and after the Pressure Reducing Valve

-Hydronic piping joints between steel tubing and fittings shall be?
- -Mechanical or Welded

-What appears on the plate of a boiler? - -Serial #, name of
manufacturer, serial # of manufacturer, MAWP, heating surface,
year built and rated steam capacity

-Waste removal of a boiler shall conduct the products of
combustion where? - -To the atmosphere

-When a quick closing valve creates water hammer what is
installed on the line? - -A water hammer adapter is installed

-Safety valve capacity may be checked in what 3 ways? - -
Accumulation test, evaporative capacity of feed water and
amount of fuel burned

-Records of inspects are kept where? - -On the premises

-No joint anchorages or guides shall be repaired, replaced or
relocated without a work permit issued by the department. This
shall not apply to the repacking of a ___ or ___ joint. - -Ball or slip
joint

-Internal high pressure inspection requires the boiler to be ____,
___, ___, and ___. - -Shutdown, drained, removal of hand and man
holes

Document information

Uploaded on
October 25, 2023
Number of pages
33
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers
$11.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
NurseSallyD
4.9
(7)
Sold
40
Followers
35
Items
1104
Last sold
1 year ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions