Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 16 pages
Exam (elaborations)

Nccer Plumbing Level 1 Exam/ 193 Questions with 100% correct Answers.

Document preview thumbnail
Preview 3 out of 16 pages

Nccer Plumbing Level 1 Exam/ 193 Questions with 100% correct Answers.

Content preview

Nccer Plumbing Level 1 Exam/ 193
Questions with 100% correct
Answers.
The modern word for plumber is derived from the Latin word for -
-A person who works with lead

-LEED applies to all areas of the profession, except - -Renovation

-Water that comes from laundry and bathtubs and reused in
known as - -Graywater

-Suggested national plumbing standards are called - -Model
codes

-You are offered a job by another contractor before you have
fulfilled your current obligations. The professional response is to -
-Ask the contractor to wait until you have met your obligations

-Your supervisor points out that you forgot to complete a step in
the assembly of a drain in a DWV system. One of the apprentices
that you are supervising was a he person installing the drain. The
responsible action is to - -Take responsibility for the work done
under your supervision

-People who develop, design, manufacture, and test mechanical
devices are called - -Mechanical engineers

-Project managers are responsible for - -Controlling the scope and
direction of a plumbing business

-The minimum standards for training programs in the United
States are set by - -Office of Apprenticeship

-Participants in an NCCER training program receive all of the
following except - -Certification as a master plumber

, -The non-profit_____________developed a system in 2000 they will
certify a building as "green" meaning it is energy efficient - -
United States Green Building Council

-Which of the following does not cause backflow - -Insufficient
levels of water

-A student must complete_______hours of OJL per year, according
to the office of Apprenticeship - -2000

-___________is the highest level of skill a craftsman can become in
their craft profession - -Master craftsman

-According to osha, a competent person is - -A worker who can
identify hazards and is authorized to take prompt corrective
measures

-OHSA stands for - -Occupational safety and health
administration

-One simple way to help ensure a safe work site is to - -Check the
job site periodically and remove any clutter

-When you wear a hard hat, the space between your head and
the shell of the hard hat should be - -1 inch

-Air-purifying respirator cartridge absorbs certain toxic vapors
from the through - -Charcoal

-The highest level of respiratory protection is provided by - -Self-
contained breathing apparatus

-To obtain the best protection from a respirator, you must
perform a positive and negative fit check - -Every time you wear it

-The SDS is a fact sheet prepared by - -The product's
manufacturer or importer

, -The most important things to look for on an SDS are the - -
Specific hazards, personal protection requirements, handling
procedures,first-aid information, and the emergency-response
telephone number

-Section 4 of an SDS - -List first aid measures

-If your supervisor tells you to evacuate the worksite, you should
- -Go to a safe location and wait until you are notified that
conditions are safe

-The sign or tag that is used to tell workers about potential
hazards or unsafe practices is a - -Caution sign

-The sign or tag that is used to tell workers about general
information not related to safety is an - -Informational sign

-The sign or tag that is used for general instructions and
suggestions related to safety measures is a - -Safety instruction
sign

-The two types of protection for opening in walls, floors, or the
ground are - -Guards and covers

-The precent of all accidental deaths in the construction industry
caused by slips, trips, and falls is - -15%

-When job site surfaces are wet or icy, you should - -Wear shoes
with cleats

-Walking and working surfaces that are located above ground
and sometimes over large equipment are called - -Platforms

-To remove tools from scaffolding, it is best to - -Lower them to
the ground using a rope

-When working on a roof, it is necessary to - -Periodically sweep
the roof to remove dirt and debris

Document information

Uploaded on
October 19, 2023
Number of pages
16
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers
$11.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
NurseSallyD
4.9
(7)
Sold
40
Followers
35
Items
1104
Last sold
1 year ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions