CDT PRACTICE EXAM (WITH QUESTIONS AND ANSWERS THAT GUARANTEE 100% SUCCESS).
CDT PRACTICE EXAM (WITH QUESTIONS AND ANSWERS THAT GUARANTEE 100% SUCCESS). The method of computation of Contractor's overhead and profits for Change Order prices, where both additions and deletions are involved, is found in the: - CORRECT ANSWER-conditions of the contract General Requirements are part of: - CORRECT ANSWER-Specifications The three essential considerations in the evaluation of a product are - CORRECT ANSWER-Requirements, Criteria, and Tests Whose responsibility is it to furnish the Shop Drawings - CORRECT ANSWER-The Contractor The division of the Work among multiple prime Contracts is described in: a) Instructions to Bidders. b) Supplementary Conditions. c) Division 01. d) Special Conditions. - CORRECT ANSWER-c) Division 01. During the Project Conception Stage, the A/E may be retained to: a) Develop outline specifications b) Describe the character of the mechanical system c) Prepare renderings d) Assist in financial feasibility studies - CORRECT ANSWER-d) Assist in financial feasibility studies The person who becomes secondarily liable for another's debt or performance is called the: a) Guarantee b) Warrantor c) Guarantor d) Warrantee - CORRECT ANSWER-c) Guarantor What is the main purpose of MasterFormat? a) for scheduling, value management, recording of design data and managing costs. b) used during the planning stage of a project. c) to organize the Project Manual, reference keynotes and detailed cost estimates. d) when there is a standardized need for information to appear upon each page of a project manual. - CORRECT ANSWER-c) to organize the Project Manual, reference keynotes and detailed cost estimates. Integrated projects are distinguished by all of the following characteristics except: a) Development of virtual project model through input from a collaborative team b) Trust-based collaboration between project team members c) Maximized efficiency through design, fabrication, and construction d) "Just as needed" team involvement to reduce owner's pre-construction expenses - CORRECT ANSWER-d) "Just as needed" team involvement to reduce owner's preconstruction expenses Outline Specifications are written for a) only Divisions 02-14 where actual products are discussed b) Divisions 01-49 c) only Divisions 01-14 (excluding mechanical and electrical) d) the exclusive use of the A/E - CORRECT ANSWER-b) Divisions 01-49 An example of a MasterFormat Level 3 specification Section is: a) 05 00 00 Metals. b) 05 20 00 Metal Joists. c) 05 21 00 Steel Joist Framing. d) 05 21 19 Open Web Steel Joist Framing - CORRECT ANSWER-d) 05 21 19 Open Web Steel Joist Framing What activities take place in the Project Conception Stage? a) The engineers develop the mechanical and electrical systems. b) The site is selected and the demolition is done. c) Feasibility studies and budget is set. d) The program is evaluated and the engineers are selected. - CORRECT
Written for
- Institution
- CDT
- Course
- CDT
Document information
- Uploaded on
- September 28, 2023
- Number of pages
- 10
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
- the person who
-
the method of computation of contractors overhead
-
general requirements are part of
-
whose responsibility is it to furnish the shop dra
-
during the project conception stage the ae may b
Also available in package deal