100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

CMGT Exam 1 – Study Questions and answers, 100% Accurate, VERIFIED.

Rating
-
Sold
-
Pages
6
Grade
A+
Uploaded on
31-07-2023
Written in
2022/2023

CMGT Exam 1 – Study Questions and answers, 100% Accurate, VERIFIED. What is the traditional project delivery method in the construction industry? - -Design-Bid-Build Who are the main stakeholders across the Design & Construction lifecycle of a project? - -Owner, A/E, General Contractor At which stage are the construction documents (CDs, including plans and specs) produced? - -At the end of the design stage All of the following are common stakeholders in the design phase, EXCEPT: Architect MechE Electrical Engineering Sub-Consultant Owner General Contractor - -General contractor All of the following are common stakeholders in the construction phase, EXCEPT: Owner General contractor Architect Sub-contractors Suppliers and manufacturers - -architect What does the design team deliver? - -Construction Documents (CDs) What are the three main goals of project management? - -Schedule, cost, quality Which organization issues the Project Mgmt Body of Knowledge (PMBOK)? - -Project Mgmt Institute (PMI) T/F The owner truly "owns" the design, in the sense that the Owner is generally "on the hook" to cover the cost of changes that must be made during the construction phase - -True T/F In DBB, there are typically two separate prime contracts signed with the owner - -True T/F In DBB the general contractor helps the design team to deliver the CDs - -False T/F In DBB, the design team has a contractual relationship with the construction team - -False T/F In public projects delivered by DBB, the contractor with the lowest bid cost usually wins the project - -True All of the following are traditional functions of nearly all AEC companies, EXCEPT: Schematic design (SD) Design development (DD) Design optimization (DO) Construction documents (CDs) - -Design optimization Who has a contractual relationship with the owner - -General contractor Design firm (A/E) What is an example of a prime contract - -Architect to owner GC to owner All of the following companies employ project managers, EXCEPT: Architects Engr firms General Contractors Subcontractors Owners All of the above - -All of the above All of the following are traditional functions of nearly all AEC comapnies, EXCEPT: Bidding projects Managing projects Financing projects Maintaining projects - -Maintaining projects T/F Of the three most common FE disciplines to be taken by CEAE students, all three include questions on the topic of engineering economics - -True Which of the following is NOT true about construction project scheduling: A. It is the determination of the sequence by which construction activities will occur B. It considers how long each individual construction activity should be C. It is a major responsibility of the GC's project manager D. It accounts for construction means and methods E.It is created and maintained by the Owner - -E. It is created and maintained by the owner All of the following represent the purpose of the project schedule BEFORE the project starts, EXCEPT: A. To establish the timeframe and organize activities B. To identify who needs to what and when C.To identify the needed resources D.To create 'what-if' scenarios to analyze alternatives E. to force detailed thinking F.To identify the critical path G.To show project status - -G. to show project status A Work Breakdown Structure (WBS) is A. A hierarchical system which sub-divides larger elements of a project into smaller work packages B. A visual schedule shown in terms of work activities and their timing C. A plan for disassembling temporary construction facilities once they have been used during the project - -A. a hierarchial system which sub-divides larger elements of a project into smaller work packages T/F The best project schedule

Show more Read less
Institution
CMGT
Course
CMGT









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CMGT
Course
CMGT

Document information

Uploaded on
July 31, 2023
Number of pages
6
Written in
2022/2023
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
PassPoint02 Chamberlain School Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
173
Member since
3 year
Number of followers
105
Documents
4552
Last sold
3 weeks ago

4.1

39 reviews

5
22
4
6
3
5
2
4
1
2

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions