NICET LEVEL III WATER BASED LAYOUT LATEST UPDATE GRADED A+
NICET LEVEL III WATER BASED LAYOUT LATEST UPDATE GRADED A+ What is not included in the technical specification? General Conditions Bid documents include? •contract •specifications •contract drawings Codes, standards, Authority Having Jurisdiction (AHJ), clean-up, safety requirements, barricades, fencing, insurance and bond requirements, ect. General Conditions Addendums, time schedules, working days allowed, delay agreements, payment schedules Supplementary Conditions Specifications typically use what format? Construction Specifications Institute (CSI) Construction manager concept is when the owner contracts with the construction manager who oversees ____________ working on the project Contractors Sometimes referred to as a turn-key type agreement or contract? Design-Build Concept Multiple Prime Contractor Method has the intent is eliminate the middleman __________ __________. general contractor Multiple prime contractor method involve more than one prime contractor which consist of? •architectural/structural contractor •mechanical contractor •electrical contractor Who commonly uses the multiple prime contractor method? •federal government •general services administration (GSA) •large companies Traditional method contract uses the typical chain of command which is? Owner, architect, general contractor, subcontractor General contractors can be chosen in a number of different ways which is? •open bid method •bid-by invitation procedure •direct contractor selection Contract conditions is divided into two categories which is? General category and supplementary conditions Changes to the contract or other modifications. Addendum Types of payment schedules are? •up-front payments •progress payments •lump
Document information
- Uploaded on
- July 19, 2023
- Number of pages
- 31
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Questions & answers