WA UST Site Assessor Exam correctly answered to pass 2023
WA UST Site Assessor Exam correctly answered to pass 2023What is the hold time for soil and preserved GW GRO samples? - correct answer 14 days Is an ICC certification needed to install an AST? - correct answer No Flammability limits of gasoline - correct answer 1.4 to 7.6% How many days do you have from a tank closure to report/provide the UST checklist to ECY? - correct answer 30 days MTCA Method A lead CUL, soil - correct answer 250 mg/kg MTCA Method A lead CUL, GW - correct answer 15 ug/L Is the vadose zone saturated or unsaturated? - correct answer Unsaturated List in order of most mobile to least mobile: Bunker C, heating oil, diesel, gasoline - correct answer Gasoline, diesel, heating oil, Bunker C Is oxygenated gasoline more or less likely to dissolve in water? - correct answer More likely; fuel additives like MTBE are more soluble than gasoline Where to sample on dispenser? - correct answer 2 feet below where the piping enters the UST Where to sample along piping? - correct answer Every 50 linear feet and along joints/elbows How many GW samples are needed after decommissioning if a release to GW is confirmed, and where relative to the tank? - correct answer 3; 1 upgradient, 2 downgradient
Written for
- Institution
- UST
- Course
- UST
Document information
- Uploaded on
- June 15, 2023
- Number of pages
- 8
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
wa ust site assessor exam correctly answered to pa
-
what is the hold time for soil and preserved gw gr
-
is an icc certification needed to install an ast
-
flammability limits of gasoline
Also available in package deal