DBIA: Principles of Design-Build and Post Award & Contracts, Project Delivery
DBIA: Principles of Design-Build and Post Award & Contracts, Project Delivery Clinger Cohen Act/Defense Procurement Reform Act 1996 - ANS Allows all federal agencies to utilize Design-Build. Prior to that no enabling legislation existed allowing Design-Build. What Year? Standard of Care - ANS The level of quality that any average Design Professional would be able to perform given the circumstances. Design Build - ANS Fastest Project Delivery method, fast tracking possible overlapping design with construction utilizing incremental packages. Negotiated (Qualifications Based) - ANS Procurement Method - Common for A/E GMP (Guaranteed Maximum Price) - ANS Contract Format - Combines Cost-Plus & Lump-Sum, contractor reimbursed for actual cost plus a fee only up to a certain amount. Unit Price - ANS Contract Format - cost per piece Trust, Flexibility - ANS Successful Design Build requires _____ & _______ between participants Hammurabi - ANS Singular responsibility for both design & construction was first made into a building code by ____ Bridging Documents - ANS Owner provided items such as 20% design or more and provides prescriptive specs at RFP. Design Build - ANS Single point of responsibility for both design & construction is an attribute of what delivery method? Substantiation - ANS The process of checking milestones along the way for completeness. Prescriptive - ANS Owner requiring specific products or methods be instituted by DB team in order to achieve desired performance. False - ANS T/F Detailed estimating is the Building systems approach to estimating False - ANS T/F feasibility estimate is cost model and establishes budget for project True - ANS T/F key element of quality assurance is keeping communication lines open between owner and DB True - ANS T/F in Design/cost relationship of DB, the constructor establishes design parameters for architect False - ANS T/F trust is most important thing for DB Schematic estimating - ANS DB estimating sequence where 15%-20% of design is completed Trend logs - ANS Provides baseline budgets and schedules and list estimate trends Coordinating owner design reviews and approvals - ANS What is NOT a design managers role? Design Build Team - ANS Who is responsible for ensuring quality assurance? Weighted criteria - ANS Awarded to proposer with highest combined total points of technical and price proposals
Written for
- Institution
- DBIA
- Course
- DBIA
Document information
- Uploaded on
- June 14, 2023
- Number of pages
- 12
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
dbia principles of design build and post award amp
Also available in package deal