Combat Construction Exam Already Passed 100% Accurate
Which barrier has been tested to stop a 4,000-pound vehicle at 50mph (80kmph)? - ANSWERJersey Barrier How many man-hours will it take to install five 300-meter sections of triple-standard concertina wire obstacle? - ANSWER150 How many rolls of concertina are required to emplace three 300-meters sections of triple-standard concertina wire obstacle? - ANSWER59 rolls x 3 sections How long should it take to build a hasty position for a M113 carrier? - ANSWER36 minutes/0.6 hours If the planning factors developed for your area of operations is unknown, what is the estimated work rates for the M9 ACE? - ANSWEROne HDP = 1.5 BTH One TDP = 3.5 BTH What is the thickness required, in inches, of sandbags filled with saturated clay, to protect against a 100-pound bomb exploding 50 feet away? - ANSWER... What is the formula to calculate supplementary wire around a base camp? - ANSWER(mean perimeter) x (1.25) x (number of belts)
Written for
- Institution
- Combat Construction
- Course
- Combat Construction
Document information
- Uploaded on
- May 15, 2023
- Number of pages
- 3
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
- combat construction exam
- combat construction
-
combat construction exam already passed 100 accurate
-
combat construction stuvia
-
which barrier has been tested to stop a 4
-
000 pound vehicle at 50mph 80km