100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

ACQ 202 MODULE 3 EXAM: Part III Questions. Answered. 2022/2023. Rated A+

Rating
-
Sold
-
Pages
6
Grade
A+
Uploaded on
30-04-2023
Written in
2022/2023

ACQ 202 MODULE 3 EXAM: Part III Questions. Answered. 2022/2023. Rated A+ Document Content and Description Below ACQ 202 MODULE 3 EXAM: Part III Questions. Answered. 2022/2023. Rated A+ Which of the following is NOT one of the methods used to achieve a producible design? - Introduce variability in the manufacturing process. A Fixed-Price Incentive (Firm Target) (FPIF) contract is awarded for $25 million to design a computer based training course for the Air Force with a period of performance of 18 months. What reports, if any, must the Air Force Program Manager (PM) require the contractor provide regarding their cost, schedule, and technical performance? - The contractor would submit an Integrated Program Management Report (IPMR) with formats 1, 5, 6 and 7. In which of situations is early operational testing least likely to be required for non-developmental item (NDI)? - When the NDI will be maintained by the contractor and used in the same environment for which it was designed. Under what condition would contractor logistics support be most appropriate for a non-developmental item (NDI) communications device being acquired by the U.S. Army? - The configuration of the device is expected to change frequently to incorporate technological advances as they become available. Earned Value Management provides a sound basis for (select all the apply): - 1. Estimating probable completion times and costs 2. Taking corrective action. 3. Identifying problems. 4. Re-planning the project, if needed. Which of the following best describes the differences between the "incremental" and "waterfall" development models? - The "incremental" model follows an evolutionary approach, where the "waterfall" model builds the entire system all at once. Program Managers can use data from the Integrated Program Management Report (IPMR), including the Performance Measurement Baseline (PMB) to integrate _____________ and _____________ performance data with objective technical measures of performance. - Cost / schedule. The first step in developing a Performance Measurement Baseline (PMB) is to: - Define or scope all work. Which of the following is NOT a consideration when making tradeoffs among various functional areas to achieve a balanced design? - Profits from manufacturing. When do the OSD Comptroller analyst and Office of Management and Budget (OMB) analyst hold hearings to review the service's budgets? - Each year around October and November. Which of the following best describes software management metrics? - Metrics that determine progress against the plan. Which one of the Integrated Program Management Report formats reports time-phased budgets that are displayed showing current period, cumulative value to date, the next six months, and five additional specified periods which take the contract to completion? - Format 3 As part of the overall system engineering process, there are a variety of software development methods, but three most common at DoD and Waterfall Approach, the Incremental Approach, and the ______ Approach. - Spiral. The extent of developmental testing and evaluation necessary on a commercial or non-developmental item depends on __________. - The amount of modification required, the environment in which

Show more Read less
Institution
ACQ 202
Course
ACQ 202









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
ACQ 202
Course
ACQ 202

Document information

Uploaded on
April 30, 2023
Number of pages
6
Written in
2022/2023
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Savior NCSU
View profile
Follow You need to be logged in order to follow users or courses
Sold
94
Member since
2 year
Number of followers
70
Documents
3432
Last sold
2 weeks ago

3.5

25 reviews

5
9
4
7
3
3
2
0
1
6

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions