ACQ 202 MODULE 3 EXAM: Part III Questions. Answered. 2022/2023. Rated A+
ACQ 202 MODULE 3 EXAM: Part III Questions. Answered. 2022/2023. Rated A+ Document Content and Description Below ACQ 202 MODULE 3 EXAM: Part III Questions. Answered. 2022/2023. Rated A+ Which of the following is NOT one of the methods used to achieve a producible design? - Introduce variability in the manufacturing process. A Fixed-Price Incentive (Firm Target) (FPIF) contract is awarded for $25 million to design a computer based training course for the Air Force with a period of performance of 18 months. What reports, if any, must the Air Force Program Manager (PM) require the contractor provide regarding their cost, schedule, and technical performance? - The contractor would submit an Integrated Program Management Report (IPMR) with formats 1, 5, 6 and 7. In which of situations is early operational testing least likely to be required for non-developmental item (NDI)? - When the NDI will be maintained by the contractor and used in the same environment for which it was designed. Under what condition would contractor logistics support be most appropriate for a non-developmental item (NDI) communications device being acquired by the U.S. Army? - The configuration of the device is expected to change frequently to incorporate technological advances as they become available. Earned Value Management provides a sound basis for (select all the apply): - 1. Estimating probable completion times and costs 2. Taking corrective action. 3. Identifying problems. 4. Re-planning the project, if needed. Which of the following best describes the differences between the "incremental" and "waterfall" development models? - The "incremental" model follows an evolutionary approach, where the "waterfall" model builds the entire system all at once. Program Managers can use data from the Integrated Program Management Report (IPMR), including the Performance Measurement Baseline (PMB) to integrate _____________ and _____________ performance data with objective technical measures of performance. - Cost / schedule. The first step in developing a Performance Measurement Baseline (PMB) is to: - Define or scope all work. Which of the following is NOT a consideration when making tradeoffs among various functional areas to achieve a balanced design? - Profits from manufacturing. When do the OSD Comptroller analyst and Office of Management and Budget (OMB) analyst hold hearings to review the service's budgets? - Each year around October and November. Which of the following best describes software management metrics? - Metrics that determine progress against the plan. Which one of the Integrated Program Management Report formats reports time-phased budgets that are displayed showing current period, cumulative value to date, the next six months, and five additional specified periods which take the contract to completion? - Format 3 As part of the overall system engineering process, there are a variety of software development methods, but three most common at DoD and Waterfall Approach, the Incremental Approach, and the ______ Approach. - Spiral. The extent of developmental testing and evaluation necessary on a commercial or non-developmental item depends on __________. - The amount of modification required, the environment in which
Written for
- Institution
- ACQ 202
- Course
- ACQ 202
Document information
- Uploaded on
- April 30, 2023
- Number of pages
- 6
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
acq 202 module 3 exam part iii questions answered 20222023 rated a document content and description below acq 202 module 3 exam part iii questions answered 20222023 rated a which of the fo
Also available in package deal