Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

MAN 6925 Project Management - Edith Cowan University._ PROJECT MANAGEMENT PLAN INFORMATION SYSTEMS

Rating
-
Sold
-
Pages
21
Grade
A+
Uploaded on
11-04-2023
Written in
2022/2023

MAN 6925 Project Management - Edith Cowan University. PROJECT MANAGEMENT MAN 6925 Project Management - Edith Cowan University. PLAN INFORMATION SYSTEMS Table of Contents Introduction ....2 Project Background ...2 Purpose of the Report 2 Scope Management Plan ....2 Project Stakeholders ..2 Problem Statement 2 Project Goals & Objectives .3 Project Deliverables ...3 Technical Requirements ..3 Project Milestones 4 Project Limitations & Constraints .4 Project Acceptance Criteria .4 Project Methodology – Agile Management .4 Project Work Breakdown Structure (WBS) .5 Project Scheduling & Network 5 Gantt chart ..8 Project Costing: Cost Management Plan 9 Project Resourcing ..10 Communication Management Plan ..12 Communication & Meeting Guidelines .12 Mediums ...13 Ethical & Professional Codes .13 Stakeholder Management Plan ...13 Stakeholder Analysis ....13 Stakeholder Engagement ...14 Procurement Plan ...15 Procurement Requirements 15 Solicitation Planning 16 Risk Management Plan 18 References ....20 Introduction Project Background The project is an information system that needs to be designed, developed, and deployed during the project timeframe. The information system can be developed in any of the programming language and it will be required to procure a server and twenty five PCs to run the information system. It is required to configure the PCs with Windows 10 Operating System and to add them to the existing network. The software needs to be developed by the sub-contractors and the server is required to be set up and tested. Purpose of the Report The primary purpose of creating the report is to develop a project management plan for the information system. The report focuses upon the project scope, project costs, project schedule, communication, and project stakeholders. Scope Management Plan Project Stakeholders The key stakeholders of the project are: • Project Sponsor: The organization for which the information system is being developed will be the primary stakeholder of the project. • Project Subcontractors: The stakeholder group will be the project team that will be carrying out the task of design, development, and deployment of the system. • Supplier Groups: Server, twenty five PCs, and other tools will be supplied by the stakeholders (Atkinson, Crawford & Ward, 2006). • End-User: The end system users will provide their feedback on the system. • Project Steering Committee: The stakeholder will provide approvals and will act as the mediator between the sponsor and subcontractors. Problem Statement The information system that is being developed will allow the organization to get rid of the existing issues of data mismanagement, data duplication, slower processing speed, and manual errors. Project Goals & Objectives The goals and the objectives of the project are: • To develop the information system in the programming language determined without any defects in the final release. • To adhere to the functional and non-functional requirements during the system design and development phases. • To maintain the project schedule as per the estimations without any schedule variance at any stage. • To maintain the project budget as per the estimations without any cost variance at any stage (Wearne, 2014). Project Deliverables The main deliverables in the project will be: • Project Brief: It will be a document covering a brief of the information system requirements, project budget, resources, and schedule. • Project Plan: A detailed description of the project scope, methodology, costs, schedule, stakeholders, resources, communication, and procurement. • System Design: The wireframes and UI aspects will be covered in the system design document. • Source Code: The source code will be developed in the programming language determined by the senior management and technical experts. • Defect Report: The defect report will include the details of the bugs identified in the testing phase. • Completion/Closure Report: It will be the final deliverable of the project. Technical Requirements • Server: The information system will be deployed on the server. • PCs: There will be 25 PCs required to deploy the system. • NoSQL Database: The NoSQL database that will be used and implemented in the system will be MongoDB. • Development Tools: Microsoft Visual Studio • Testing Tools: Bugzilla, TestLink • Design Tools: Microsoft Visio, Sketch • Project Management Tools: Microsoft Projec

Show more Read less
Institution
MAN 6925 Project Management
Course
MAN 6925 Project Management










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
MAN 6925 Project Management
Course
MAN 6925 Project Management

Document information

Uploaded on
April 11, 2023
Number of pages
21
Written in
2022/2023
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$12.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
AllAcademic Other
View profile
Follow You need to be logged in order to follow users or courses
Sold
67
Member since
6 year
Number of followers
39
Documents
548
Last sold
1 month ago
All the academic resources you need.

All the academic resources you need.

3.7

7 reviews

5
3
4
1
3
2
2
0
1
1

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions