INP 401 EPIC questions with correct answers
2-At which of the three levels for procedure order configuration (Procedure, Procedure Category, or System Definitions) could you potentially do ALL of your build? Why would this be a bad idea? CORRECT ANSWER It is possible to make all settings at the Procedure (EAP) level. However, doing so would be inefficient and difficult to maintain. 2-True or False? Linking your Procedures to a Procedure Category is optional. CORRECT ANSWER False. All Procedures must be linked to a Procedure Category. The link is made in the Procedure record. 2-On which screen are the buttons for priority and frequency that display in the Order Composer configured? CORRECT ANSWER Buttons for priority and frequency are set on the Inpatient Order Composer Button Selections - I screen (also referred to as the tic-tac-toe screen). 2-At which of the three levels for procedure order configuration (Procedure, Procedure Category, or System Definitions) can you set a default frequency? CORRECT ANSWER A default frequency can be set at the Procedure (EAP) or Procedure Category (EDP) level. Refer to the Where Can Settings Be Made table earlier in this chapter. 3-You remove Priority from the display items for your diet orders. But when you test one of your diet orders, Priority shows up as the last display item. What might be causing that? CORRECT ANSWER Priority is probably a required item. Check the item control fields in the Procedure, Procedure Category, and System Definitions. A required item will always display, even if it's not a display item. 3-True or False? If there are Item Control settings in OCCs at both the Procedure and Procedure Category level, the settings at the Category level will not affect the order. CORRECT ANSWER False. Item Control is cumulative, so settings from both the Category and Procedure level OCCs will affect the order.
Document information
- Uploaded on
- March 13, 2023
- Number of pages
- 8
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Questions & answers