PSM 1 EXAM 2022 WITH COMPLETE SOLUTION
constitute the Sprint Backlog and are often estimated in hours. - answerTasks is responsible for the Scrum process, facilitate the team and protect the team from outside noise. - answerScrum Master A Development Teams Daily Scrum is consistently taking longer than 15 minutes. Which Statement best describes what should be done? - answerThe Scrum Master should facilitate the event in a way that keeps it to the time box. A new developer is having continuing conflicts with existing Development Team members and creating a hostile environment. If necessary, who is responsible for removing the team member? - answerThe Scrum Master is responsible, because he/she removes impediments. (The ANSWER is actually development team) A product backlog is never complete - answerTrue - As long as a product exists, its Product backlog also exists A Product Owner has the authority to replace an item in the Sprint Backlog - answerFalse A properly functioning Scrum Team will have at least one Release Sprint and may well have several. - answerFalse A Scrum Master is introducing Scrum to a new Development Team. The Team has decided that a retrospective is unnecessary. What action should the Scrum Master take? - answerConsult with the Product Owner to see how he/she feels about the situation A Scrum Master is keeping a list of open impediments, but it is growing and he/she has been able to resolve only a small portion of the impediments. Which three (3) techniques would be most helpful in this situation? (Choose three answers) - answer1) Prioritize the list and work on them in order 2) Consult with the Development Team 3) Alert management to the impediments and their impacts A Scrum Master is working with a Development Tea m that has members in different physical locations. The Development Team meets in a variety of meeting rooms and has much to do logistically (for example, set up conference calls) before the Daily Scrum. What action should the Scrum Master take? - answerSet up the meeting and tell the Development Team that is how it will be done A Scrum Master is working with a Development Team that has members in different physical locations. The Development Team meets in a variety of meeting rooms and has much to do logistically (for example, set up conference calls) before the Daily Scrum. What action should the Scrum Master take? - answerAllow the Development Team to self-manage and determine for itself what to do A Scrum Team is only allowed to meet with stakeholders during Sprint Review - answerFalse A scrum team uses 2 weeks sprints and time box their Sprint Planning to 6 hours. Does this break rules of Scrum? - answerFalse According to Scrum, the amount of time for a team to plan Sprint activities is expressed in what unit of time? - answerHours According to Scrum, the amount of time for a team to plan Sprint activities is expressed in what unit of time? - answerHours All Development Teams working on the same Product should use the same Product Backlog. - answerTrue All the Scrum Teams working on the same product should have the same Sprint length. - answerFalse An abnormal termination of a Sprint is called when? - answerWhen the Product Owner determines that it makes no sense to finish it. An organization has decided to adopt Scrum, but management wants to change the terminology to fit with terminology already used. What will likely happen if this is done? - answerAll answers apply. 1) Without a new vocabulary as a reminder of the change, very little change may actually happen. 2) The organization may not understand what has changed with Scrum and the benefits of Scrum may be lost. 3) Management may feel less anxious As the Sprint Planning meeting progresses, the workload is getting greater than the Development Team's capacity. Which two actions make the most sense to do? (Choose 2 answers) - answer1) Remove or change Product Backlog items 2) The Development Team ensures that the Product Owner is aware, starts the Sprint and monitor progress. Choose three responsibilities of a self-organizing Development Team. (Choose three answers) - answer1)Do the work planned in the Sprint Backlog. 2) Pull Product Backlog items for the Sprint. 3) Set the time for the Daily Scrum OR Track Velocity Could the Sprint Planning be finished if only work planned for the first days of the Sprint is decomposed to units of one day or less? - answerYes, if the remaining work is also estimated, maybe in bigger units Could the Sprint Planning be finished if only work planned for the first days of the Sprint is decomposed to units of one day or less? - answerYes, if the remaining work is also estimated, maybe in bigger units Cross-functional teams are optimized to work on a technical layer of a system (e.g. GUI, database, middle tier, interfaces). - answerFalse Definition of "Done" is created during the first Sprint and remains unchanged until the Product release. - answerFalse Definition of Done can be reviewed and adapted during each Sprint Retrospective. True or False? - answerTrue Development Team membership should change: - answerAs needed, while taking into account a short term reduction in productivity. Development Teams include which role(s)? - answerNo other roles. Development Team is a role. A Development Team includes Development Team members Development teams should be set stretch goals by the Product Owner as part of Sprint Planning - answerFalse During a Sprint Retrospective, for what is the Scrum Master responsible? - answerFacilitating and also participating as a Scrum Team member During a Sprint, a Development Team determines that it will not be able to finish the complete forecast. Who should be present to review and adjust the Sprint work selected? - answerThe Product Owner and the Development Team During a Sprint, when is new work or further decomposition of work added to the Sprint Backlog? - answerAs soon as possible after they are identified During Sprint Planning, all Product Backlog items must be be decomposed to a definitive set of tasks for the Development team to complete - answerFalse During Sprint Planning, every task must be estimated so the Development Team is sure that it has the capacity to complete them in the Sprint - answerFalse During the Daily Scrum, the Development team must answer the 3 questions - answerFalse During the Daily Scrum, the Scrum Master's role is to: - answerTeach the Development Team to keep the Daily Scrum within the 15 minute timebox. During the sprint review the project is assessed against the - answerSprint goal During the Sprint, the Scrum Master's role is to do which two of the following? - answer1) Facilitate inspection and adaptation opportunities as requested or needed. 2) Remove impediments Even though the Scrum Team is following the Scrum framework entirely and their project is going well, the organization as a whole does not have a good understanding of Scrum, which makes some troubles for the Scrum Team. Who should try to fix it? - answerThe Scrum Master For the purpose of transparency, when does Scrum say a new increment of working software must be available? - answerAt the end of every Sprint For which is the Scrum Master responsible? - answerThe Scrum process being adopted and used properly Formal opportunities: - answerEverything BUT Sprint From the activities given, which is the latest step in sequence of the Scrum framework? - answerSprint Retrospective How does the Scrum Master serve the Development Team? Select the three most appropriate answers. - answer1) Helping the development team to create high-value products 2) Coaching the Development Team in self-organization and cross-functionality 3) Removing impediments to the Development Team's progress How does the Scum Master help to the Product Owner? Select the three most appropriate answers. - answer1) Facilitating Scrum Events as requested or needed 2) Finding techniques for effect
Written for
- Institution
- PSM 1
- Course
- PSM 1
Document information
- Uploaded on
- January 31, 2023
- Number of pages
- 34
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Questions & answers