Final Exam for: IS-200.C: Basic Incident Command System for Initial Response, ICS-200 | Questions with 100% Correct Answers | Verified | Updated 2023
Which Incident Type is limited to one operational period, does not require a written Incident Action Plan, involves Command and General Staff only if needed, and requires several single resources? A. Type 3 B. Type 5 C. Type 2 D. Type 4 - D. Type 4 When the supervisor-to-subordinate ratio exceeds manageable span of control, additional Teams, Divisions, Groups, Branches, or Sections can be established. Which NIMS Management characteristic does this describe? A. Modular Organization B. Management by Objectives C. Comprehensive Resource Management D. Formal Communication - A. Modular Organization When command is transferred, then all personnel involved in the incident should be told: A. The limits of the Incident Commander's scope of authority B. The Incident Commander's cell phone number C. The qualifications of the incoming Incident Commander D. The effective time and date of the transfer - D. The effective time and date of the transfer Which of these is NOT a tool that you would need at the incident? A. Agency Procedures Manual B. Exercise Plan C. Emergency Operations Plan (EOP) D. Maps of the affected area - B. Exercise Plan
Written for
- Institution
- IS-200.C
- Course
- IS-200.C
Document information
- Uploaded on
- January 29, 2023
- Number of pages
- 6
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
- ics 200
-
final exam for is 200c basic incident command system for initial response