100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

WGU C215 Study Guide question and correct answers rated A+ already passed!

Rating
-
Sold
-
Pages
4
Grade
A+
Uploaded on
09-12-2022
Written in
2022/2023

WGU C215 Study Guide question and correct answers rated A+ already passed!Total Quality Management (TQM) Philosophy 1. customer focus 2. continuous improvement 3. employee empowerment 4. use of quality tools 5. product design 6. process management 7. managing supplier quality Process Capability Index (Cpk) Basic function of Six Sigma. Measures the process potential and performance of processes. The higher the range of Cpk, the improved is the ability of the process to complete its necessities. Uses both the process variability and the process specifications to determine whether the process is "capable." Six Sigma A disciplined, data-driven approach and methodology for eliminating defects (driving toward six standard deviations between the mean and the nearest specification limit) in any process - from manufacturing to transactional and from product to service. Design Capacity The theoretical maximum output of a system in a given period under ideal conditions. Effective Capacity The capacity a firm expects to achieve given its current operating constraints. Location Analysis proximity to customers, transportation, source of labor, community attitude, proximity to suppliers, and many other factors. Line Processes A type of process used to produce a large volume of a standardized product. Batch Processes A type of process used to produce a small quantity of products in groups or batches based on customer orders or specifications. Project Processes A type of process used to make a one-at-a-time product exactly to customer specifications. Continuous Processes A type of process that operates continually to produce a high volume of a fully standardized product. Bottleneck Longest task in the process. Flexible Manufacturing System (FMS) A type of automated system that combines the flexibility of intermittent operations with the efficiency of continuous operations. Output/Input Control A technique for monitoring the flow of jobs between work centers. Value-Added The net increase created during the transformation of inputs into final outputs. Hybrid Layouts Layouts that combine characteristics of process and product layouts. Relationship Chart (REL) Table that reflects opinions of managers with regard to the importance of having any two departments close together. Rectilinear Distance The shortest distance between two locations using north-south and east-west movements. From-To Matrix Table that gives the number of trips or units of product moved between any pair of departments. Block Plan Schematic showing the placement of resources in a facility. Mean Observed Times The average of the observation times for each of the work elements. Normal Time The mean observed time multiplied by the performance rating factor by the frequency of occurrence. Standard Time The length of time it should take a qualified worker using appropriate process and tools to complete a specific job, allowing time for personal fatigue and unavoidable delays. Just-in-Time (JIT) A philosophy designed to achieve high-volume production through elimination of waste and continuous improvement. Based on a "pull" system rather than a "push" system. The three elements are just-in-time manufacturing, total quality management, and respect for people. Kanban card A card that specifies the exact quantity of product that needs to be produced. Continuous Improvement A philosophy of neverending improvement. Tier One Suppliers Supplies materials or services directly to the processing facility. Tier Two Suppliers Directly supplies materials or services to a tier one supplier in the supply chain. Tier Three Suppliers Directly supplies materials or services to a tier two supplier in the supply chain. Supply Chain Management (SCM) Management of the flow of materials from suppliers to customers in order to reduce overall cost and increase responsiveness to customers. Capacity Requirements Planning (CRP) Determines the labor and machine resources

Show more Read less
Institution
WGU C215
Course
WGU C215








Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
WGU C215
Course
WGU C215

Document information

Uploaded on
December 9, 2022
Number of pages
4
Written in
2022/2023
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
StuviaExamHub Havard School
View profile
Follow You need to be logged in order to follow users or courses
Sold
458
Member since
3 year
Number of followers
355
Documents
17014
Last sold
1 week ago
EXAM HUB (LATEST UPDATE)

QUALITY WORK OF ALL KIND OF QUIZ or EXAM WITH GUARANTEE OF AN A+ latest updates Im an expert on major courses especially; psychology,Nursing, Human resource Management & Project writing. Assisting students with quality work is my first priority. I ensure scholarly standards in my documents . I assure a GOOD GRADE if you will use my work. Feel free to purchase n recommend others for 100% pass EXAMS!

3.7

85 reviews

5
39
4
10
3
17
2
6
1
13

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions