Certified Associate in Project Management (CAPM)
Direct and Manage Project Work is the process of leading and performing the work defined in the project management plan. There are several outputs from this process. The only one defined as typically tangible components completed to meet the project objectives is: - Answer - Deliverables A diagram that assists in gathering requirements by showing a business system and how other people and systems interact with it is known as a: - Answer - Context diagram A form of Communication Methods, pull communication such as a wiki, is best used for: - Answer - Very large volumes of information A numbering system used to uniquely identify each component of the work breakdown structure is called: - Answer - Code of accounts A RACI chart is typically a matrix that shows an activity or work package along with the person who is responsible, accountable, to be consulted, or to be informed. It is a type of: - Answer - Responsibility assignment matrix A simulation that involves calculating multiple project durations using probability distributions is called: - Answer - Monte Carlo An Enterprise Environmental Factor that may be taken into consideration when Planning Cost Management is: - Answer - Currency exchange rates As a change control expert, you are asked to work on a plan that documents how changes will be controlled and monitored on the project. Additionally you are told it will ultimately become part of the project management plan. This document is known as a: - Answer - Change management plan As a project team member, you know that the change control board approves or rejects all changes. During a team meeting, you ask the project manager whose responsibility it is to schedule and implement the changes. She tells you it is the responsibility of: - Answer - Project team As of the measurement point, your project's TCPI is 1.33 and your CPI is .85. How would you interpret this information? - Answer - The work will be harder to complete As Planning occurs, more and more is known about the project and the project management plan becomes increasingly detailed. This detailing is known specifically as: - Answer - Progressive elaboration Control Quality checks for correctness, which according to PMBOK is a function of: - Answer - Accuracy
Document information
- Uploaded on
- November 14, 2022
- Number of pages
- 4
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Questions & answers