Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 30 pages
Exam (elaborations)

CSLB B License General Contractor Exam 330 Questions and Correct Answers 2026/2027

Document preview thumbnail
Preview 3 out of 30 pages

Study resource designed for the CSLB B License General Contractor Exam, featuring 330 practice questions and correct answers. Covers general building construction, project planning, estimating, construction methods, structural systems, materials, safety requirements, building codes, contracts, business practices, and California contractor licensing concepts. Organized to reinforce essential knowledge and support effective preparation for the CSLB B General Building Contractor examination.

Content preview

CSLB B LICENSE GENERAL
CONTRACTOR EXAM
If unused mortar stiffens due to hydration of cement, what must you do? - Discard the
mortar
What minimum time must you wait before caulking ̣ or gṛ outing ̣ new tiles? - 24-48 Hours
How long ̣ should you wait before installing ̣ tile on a shower pan? - 24 Hours
Unstable dry rock, angu
̣ lar gṛ avel, sandy loam, and cohesive soils having ̣ compressive
strengṭ hs gṛ eater than 0.5 and less than 1.5 tons/sq ft (tsf), are typical examples of: -
Type-B Soils
If 65 street lights
̣ are fed by a 2275-volt series circuit, what is the voltag e
̣ across each
light?
̣ - 35V
In a series circuit, the total voltage
̣ is divided equally.

For safety reasons, the maximum simple slope of an excavation, up to 20 ft deep, in
Type-B soil is: - 1:1 (45°)
A Pittsburgh
̣ joint is used in: - HVAC ductwork
The drain for a pressure relief valve on a water heater should be extended to: - The
outside of the building ̣
What is the minimum slope toward the drain of a shower pan? - 1/4" per foot (2%) What
is the diameter of #3 rebar? - 3/8"
If a vendor fails to provide an MSDS, you have the rig h
̣ t to call: - Cal/OSHA or DOSH
When installing ̣ a door jamb, you need shims at: - Both hing e
̣ and strike sides, three on
each side.

Which of the following ̣ is used to adhere vinyl floors?

A. Epoxy cement
B. Asphalt mastic
C. Latex primer
D. White gḷ ue - Epoxy cement

,When do you need bracing ̣ for a drywall wall? - Diago
̣ nal bracing ̣ is needed every 25' for
any drywall wall.

How should you clear the roots from a construction site? - Clear roots to 12" below
gṛ ade.

Dividing ̣ watts by amps gị ves you: - Volts

The most frequent on-the-job roofing ̣ accidents are: - Falls

Which of the following ̣ is NOT a type of wood block flooring?
̣

A. Parquet
B. Wood Mosaic
C. Wood Tile
D. All of the above. - Wood tile

Lightweig
̣ ht
̣ concrete is best used for:

A. Curb and Gutter
B. Second floor decking ̣
C. First floor slab on gṛ ade
D. Footingṣ - Second floor decking ̣

The tool used to carry gṛ out needed to patch a small hole is a:

A. Hawk
B. Poling ̣ board
C. Spot board
D. Mason's scutch - Spot Board

Which pipe is NOT appropriate for industrial wastes?

A. Cast iron
B. Schedule 40 ABS DWV
C. Extra strengṭ h vitrified clay

D. Copper - Copper

Where do you need a fire wall?

A. Between a living ̣ room and a bedroom
B. Between a bedroom and a bathroom
C. Between a kitchen and a bath
D. A separation wall between a dwelling ̣ and an attachment - A separation wall between
a dwelling ̣ and an attachment.

, What is the minimum clearance between rough
̣ gṛ ound and untreated subfloor joists? -
18 inches

Who may remove asbestos? - Contractor with Asbestos Certification on license.

Which of the following ̣ is NOT likely to be found in sign
̣ ificant proportions in gṛ anular
soil?

A. Gravel
B. Sand
C. Silt
D. Clay - Clay

Stiles and rails are used on which of the following ?
̣

A. Furred walls
B. Roofs
C. Windows
D. Slabs -
Windows.

A stile is the vertical edges
̣ of the window and the rails are the bottom and top.

What does a high
̣ slump test indicate? - Too much water.

Metal concrete forms should be?

A. Oiled
B. Watered
C. Placed against
̣ gravel
̣
D. Discarded after each use - Oiled

What does the R mean in a description of insulation? - Resistance

What kind of door would you install for someone with a disability?

A. Automatic with minimum of 3 seconds to close
B. Automatic with maximum of 5 seconds to open
C. Manual with maximum of 8.5 pounds to operate
D. Either A or C - Either A or C

Triple-walled metal chimney installations are reg u
̣ lated by: - ICC

ICC-IBC-IRC is the international code council. IBC is international building ̣ code
commercial. IRC is the international residential code.

Document information

Uploaded on
August 14, 2026
Number of pages
30
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$16.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
MARYANNA
5.0
(1)
Sold
2
Followers
0
Items
557
Last sold
1 month ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions