Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 11 pages
Exam (elaborations)

CPSI EXAM CERTIFICATION EVALUATION TESTED QUESTIONS FULL SOLUTION GUIDE.pdf

Document preview thumbnail
Preview 2 out of 11 pages

CPSI EXAM CERTIFICATION EVALUATION TESTED QUESTIONS FULL SOLUTION GUIDE.pdf

Content preview

CPSI EXAM CERTIFICATION EVALUATION TESTED QUESTIONS FULL SOLUTION GUIDE




Question:
The site history file for a playground should contain.

Answer:
comprehensive inventory of all equipment, a parts list, maintenance and inspection recommendation



Question:
An opening may present a common crush or shear hazard only it.

Answer:
if it grabs the 5/8 (16mm) dowel



Question:
which of the following is true when using flexible components as access to a platform.

Answer:
a means of hand support during transition to the platform must be provided



Question:
A standard of care for playground equipment and surfacing is achieved after.

Answer:
all non compliance identified have been remediated



Question:

, which option is best when a piece of playground equipment must be taken out of service for an
extended period of time.

Answer:
use heavy duty construction fencing in conjunction with signage



Question:
which of the following would be BEST location for a new playground.

Answer:
Well drained area



Question:
The following data are recorded during a saftey audit of a public playground intended for users aged
2-5 with impact attenuating surfacing: A 96 inch (2440 mm) high free standing climber A tot swing
with a 120 inch high rail A flexible climber attached to a composite structure at deck height which
of the following actions should the CPSI recommend in order to bring the playground into
compliance with ASTM 1487 and the CPSC handbook.

Answer:
leave the climber alone,,lower the tot swing to 96 inches insure that the flexible climber is not the
sole means of access and remove the sliding pole



Question:
Before opening a new playground and allowing use by the public an owner/operator should.

Answer:
Audit the playground and rectify any non-compliant issues found



Question:
A cpsi discovers that an independent shade structure is 72 inches above the pivot point of a swing.
The CPSI should.

Answer:

Document information

Uploaded on
August 12, 2026
Number of pages
11
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$17.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
0
Followers
0
Items
2956
Last sold
-


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions