Exam (elaborations)

NICET Level 1 Highway Construction Questions and Answers 2026/2027 – A+ Grade|NICET Level 1 Highway Construction Certification Prep – Verified Edition

Document preview thumbnail
Preview 2 out of 9 pages

NICET Level 1 Highway Construction Questions and Answers 2026/2027 – A+ Grade|NICET Level 1 Highway Construction Certification Prep – Verified Edition

Content preview

NICET Level 1 Highway Construction Questions and Answers 2026/2027 –
A+ Grade|NICET Level 1 Highway Construction Certification Prep – Verified
Edition




Acceptance - (answer)The written acceptance by the Department of the Work.



acceptance testing - (answer)Testing conducted by the Department to measure the degree of
compliance to the Contract



actual cost - (answer)The computed cost using calculations provided



addendum - (answer)A Contract revision or response to a Contractor inquiry issued after advertisement
and before the opening of bids.



as-built quantity - (answer)The quantity of a completed Item eligible for payment



authorized funding amount - (answer)The amount of funds authorized by the Department for the
Contract



Bidder - (answer)The individual, firm, partnership, corporation, joint venture, or any acceptable
combination thereof that submits a bid to the Department.



bridge - (answer). A structure, other than a culvert, including supports, erected over a depression or an
obstruction, such as water, highway, or railway, and having a track or passageway for carrying traffic or
other moving loads and having a length 3 measured along the center of the structure of more than 20
feet between undercopings of abutments or extreme ends of openings for multiple boxes. Structure
dimensions are defined as follows:



bridge length - (answer)The overall length measured along the line of survey stationing from back to
back of backwalls of abutments, if present, otherwise end to end of the bridge floor; but, in no case less
than the total clear opening of the structure

, NICET Level 1 Highway Construction Questions and Answers 2026/2027 –
A+ Grade|NICET Level 1 Highway Construction Certification Prep – Verified
Edition




bridge width - (answer)The clear width measured at right angles to the longitudinal centerline of the
bridge between the bottom of curbs, or in the case of multiple height of curbs, between the bottoms of
the lower risers or, if curbs are not used, between inner faces of parapet or railing



Change Order. - (answer)A written order issued by the Department to the Contractor after execution of
the Contract authorizing one or more of the following: 1. Changes in the Work. 2. Modifications in the
basis of payment. 3. Modifications to Contract Time.



Commercially Useful Function - (answer)Occurrences in which the subcontractor is responsible for the
execution of a distinct element of the work of a contract and carrying out its responsibilities by actually
performing, managing, and supervising the work involved, and with respect to materials and supplies
used on the contract, prepares the estimate, negotiates price, determines quality and quantity, orders
the material, arranges delivery, installs (where applicable), and pays for the material and supplies itself
for the project.



Completion - (answer)When all of the following have occurred: 1. The Work has been satisfactorily
completed in all respects according to the Contract. 2. The Project is ready for use by the Department as
required by the Contract. 3. The Contractor has satisfactorily executed and delivered to the RE all
documents, certificates, and proofs of compliance required by the Contract including the Notice of
Completion.



construction operations - (answer)Physical work done in the performance of the Contract within the
Project Limits. Does not include off-site mobilization, procurement and off-site storage of materials and
plants, engineering, performance bond and payment bond, surveys, working drawings, off-site field
offices, schedules, certificates, forms, or documents



Contract - (answer)The written integrated agreement between the Department and the Contractor
setting forth the obligations of the parties, including, but not limited to, the performance of the Work
and the basis of payment. It includes the advertisement, Proposal, Certification as to Publication and
Notice of Advertisement for Proposal, bid, Appointment of Agent by Nonresident Contractors,
Resolution of Award of Contract, Executed Form of Contract, performance and payment bonds,
Specifications, Plans, Right-of-Way Plans, permits, boring logs, pavement core records, addenda, Change

Document information

Uploaded on
August 12, 2026
Number of pages
9
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
Free
Download

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
0
Followers
0
Items
252
Last sold
-


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions