Page 1 of 33
ITEC 3010 FINAL EXAM REVIEW*** QUESTIONS
AND ANSWERS | VERIFIED AND WELL
DETAILED ANSWERS |DOWNLOAD AND PASS |
LATEST EXAM UPDATE 2026/2027
An integrity control that verifies the data in one field
against the data in other fields is called a ____ control.
a. value
b. field combination
c. completeness
d. data validation
❖b. field combination
The objective of the ____ is to keep the system running
productively during the years following its initial
installation.
a. maintenance phase
,Page 2 of 33
b. support phase
c. version release
d. deployment phase
❖b. support phase
Which one is NOT a correct statement for testing ?
a. All statements are correct
b. Testing is done to determine system operational
characteristics and whether it contains any defects
c. Developers can test software by designing and building
the software, exercising its function, and examining the
results
d. To conduct a test, developers must have a well-defined
deployment plan for both functional and nonfunctional
requirements.
e. Testing is the process of examining a component,
subsystem, or system looking for defects
,Page 3 of 33
❖d. To conduct a test, developers must have a well-
defined deployment plan for both functional and
nonfunctional requirements.
Which is NOT a major challenge of Agile project
management?
a. balance flexibility with order
b. balance chaos with control
c. balance agility with structure
d. balance formality with ceremony
❖d. balance formality with ceremony
For the RMO company, which one is NOT a reason to rule
out the upgrading of the CSS "in place"?
a. RMO expects to save money by having an external
vendor host the CSMS
b. The current infrastructure is near capacity
, Page 4 of 33
c. Existing CSS programs and Web interfaces are working
properly
d. Current system software is several versions out of date
❖c. Existing CSS programs and Web interfaces are
working properly
What is the name of a general control technique used to
ensure that entered data is correct?
a. Data validation control
b. Data access control
c. Data completeness control
d. Data acceptance control
❖Data validation control
Which one is NOT related to implementation activities ?
a. Testing the new software
ITEC 3010 FINAL EXAM REVIEW*** QUESTIONS
AND ANSWERS | VERIFIED AND WELL
DETAILED ANSWERS |DOWNLOAD AND PASS |
LATEST EXAM UPDATE 2026/2027
An integrity control that verifies the data in one field
against the data in other fields is called a ____ control.
a. value
b. field combination
c. completeness
d. data validation
❖b. field combination
The objective of the ____ is to keep the system running
productively during the years following its initial
installation.
a. maintenance phase
,Page 2 of 33
b. support phase
c. version release
d. deployment phase
❖b. support phase
Which one is NOT a correct statement for testing ?
a. All statements are correct
b. Testing is done to determine system operational
characteristics and whether it contains any defects
c. Developers can test software by designing and building
the software, exercising its function, and examining the
results
d. To conduct a test, developers must have a well-defined
deployment plan for both functional and nonfunctional
requirements.
e. Testing is the process of examining a component,
subsystem, or system looking for defects
,Page 3 of 33
❖d. To conduct a test, developers must have a well-
defined deployment plan for both functional and
nonfunctional requirements.
Which is NOT a major challenge of Agile project
management?
a. balance flexibility with order
b. balance chaos with control
c. balance agility with structure
d. balance formality with ceremony
❖d. balance formality with ceremony
For the RMO company, which one is NOT a reason to rule
out the upgrading of the CSS "in place"?
a. RMO expects to save money by having an external
vendor host the CSMS
b. The current infrastructure is near capacity
, Page 4 of 33
c. Existing CSS programs and Web interfaces are working
properly
d. Current system software is several versions out of date
❖c. Existing CSS programs and Web interfaces are
working properly
What is the name of a general control technique used to
ensure that entered data is correct?
a. Data validation control
b. Data access control
c. Data completeness control
d. Data acceptance control
❖Data validation control
Which one is NOT related to implementation activities ?
a. Testing the new software