The preferred method for installing drip-edge flashing is _____________. ✔Correct Answer-
over the roofing paper/felt along the rake edge
________ is the process of repairing missing mortar between brick joints. ✔Correct Answer-
pointing
A shake is ________-split, whereas a wood shingle is ________-cut. ✔Correct Answer-
hand..... machine
_____ - amp breakers are commonly used for small air conditioner units and clothes dryers.
✔Correct Answer-30
An electrical panel that uses a double-pole breaker to isolate multiple main disconnects
(breakers) from the 120-volt circuits is called a _____ panel. ✔Correct Answer-split-bus
For a 12-gauge copper wire, the maximum overcurrent protection rating is _____ amps.
✔Correct Answer-25
A relief-valve pipe terminating into a water leak catch pan is not permitted because the pan is
not __________. ✔Correct Answer-an indirect waste receptor
The horizontal spacing for supporting drainage pipe made of PVC should be a maximum of
_____ feet. ✔Correct Answer-6
TPR (temperature, pressure, and relief) valves must be set to discharge at a temperature no
higher than ________. ✔Correct Answer-210 degrees F
What is the temperature of "hot" water? ✔Correct Answer-equal to or greater than 120° F
Access to all under-floor spaces must be provided with access openings through the floor not
smaller than __________ inches by __________ inches. ✔Correct Answer-18, 24 (457 mm,
610 mm)
The vertical clearance of the service drop should be at least _____ feet above the grounds of a
residential property. ✔Correct Answer-12
The upper edge of a masonry chimney cleanout should be at least ____ inches below the lowest
inlet opening. ✔Correct Answer-6
Verified Answers |Latest Version |Guaranteed to Pass
The preferred method for installing drip-edge flashing is _____________. ✔Correct Answer-
over the roofing paper/felt along the rake edge
________ is the process of repairing missing mortar between brick joints. ✔Correct Answer-
pointing
A shake is ________-split, whereas a wood shingle is ________-cut. ✔Correct Answer-
hand..... machine
_____ - amp breakers are commonly used for small air conditioner units and clothes dryers.
✔Correct Answer-30
An electrical panel that uses a double-pole breaker to isolate multiple main disconnects
(breakers) from the 120-volt circuits is called a _____ panel. ✔Correct Answer-split-bus
For a 12-gauge copper wire, the maximum overcurrent protection rating is _____ amps.
✔Correct Answer-25
A relief-valve pipe terminating into a water leak catch pan is not permitted because the pan is
not __________. ✔Correct Answer-an indirect waste receptor
The horizontal spacing for supporting drainage pipe made of PVC should be a maximum of
_____ feet. ✔Correct Answer-6
TPR (temperature, pressure, and relief) valves must be set to discharge at a temperature no
higher than ________. ✔Correct Answer-210 degrees F
What is the temperature of "hot" water? ✔Correct Answer-equal to or greater than 120° F
Access to all under-floor spaces must be provided with access openings through the floor not
smaller than __________ inches by __________ inches. ✔Correct Answer-18, 24 (457 mm,
610 mm)
The vertical clearance of the service drop should be at least _____ feet above the grounds of a
residential property. ✔Correct Answer-12
The upper edge of a masonry chimney cleanout should be at least ____ inches below the lowest
inlet opening. ✔Correct Answer-6