Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 9 pages
Exam (elaborations)

GGH3705 ASSIGNMENT 2 SEMESTER 2 2026 - COMPLETE ANSWERS

Document preview thumbnail
Preview 2 out of 9 pages

GGH3705 ASSIGNMENT 2 SEMESTER 2 2026 - COMPLETE ANSWERS. FEEL FREE TO CONTACT ME FOR MORE ASSISTANCE. (0.7.6.0.8.3.6.0.7.0).

Content preview

, GGH3705
ASSIGNMENT 2 SEMESTER 2
2026
DUE 17 AUGUST 2026
Question 1 [30]

1. Komati Power Station Solar PV and BESS Facility
Name of the Company: WSP Group Africa (Pty) Ltd (WSP Group Africa, 2021).

 Brief Discussion of the Project: This SIA was compiled for Eskom's proposed development of a
Solar Energy Facility (SEF), a Battery Energy Storage System (BESS), and associated grid
connection infrastructure at the Komati Power Station in Mpumalanga Province (WSP Group
Africa, 2021).

 Primary Data Collection Methods Used: The SIA formed part of a broader Environmental and
Social Impact Assessment (ESIA) process, which included a dedicated specialist "Social
Assessment" (WSP Group Africa, 2021). The specific primary data collection methods would be
detailed in the social assessment appendix, but the structure indicates the use of specialised
social science fieldwork techniques.

 Explanation as to Why These Methods Were Used: These methods were employed to comply
with the legal requirements of South Africa's National Environmental Management Act (NEMA)
and the World Bank Group's Environmental and Social Framework (ESF), both of which
mandate a comprehensive assessment of social impacts for major infrastructure projects (WSP
Group Africa, 2021).

2. Agripark Project, Dutywa
Name of the Company: The specific consulting company is not identified in the source; however,
the study was conducted in collaboration with the University of Fort Hare and the provincial
Department of Agriculture (University of Fort Hare, 2020).

 Brief Discussion of the Project: This project involves an agricultural development in Dutywa
comprising a seedling nursery, an agro-processing facility, and feeder plots, intended to benefit
four local villages (University of Fort Hare, 2020).

Document information

Uploaded on
August 8, 2026
Number of pages
9
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$5.12

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
MarkyAndy
4.4
(18)
Sold
148
Followers
0
Items
309
Last sold
4 hours ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions