Who is responsible for restricting unauthorized access to
the crane's work area? - Answer-Site Supervisor/Lift
Director
Who is responsible for ensuring the crane owner is notified
of any damage to the crane or replacement/repair of wire
rope? - Answer-Crane User
Who is responsible for ensuring crane operations are
stopped if alerted to an unsafe condition? - Answer-Lift
Director
If the operator or A/D determine that ground conditions are
not suitable for the equipment being operated, they should
request the _________ correct the issue - Answer-
Controlling Entity
,2|Page
Who is responsible for ensuring that personnel involved in
crane operations understand their responsibilities,
assigned duties and associated hazards? - Answer-Lift
Director
When can the operator of a crane set the crane up with
less than fully extended outriggers? - Answer-When the
load chart allows
The outrigger pad and cribbing should be strong enough
to support? - Answer-The total weight of the crane and the
load
What must be known prior to setting up your crane? -
Answer-Location of underground vaults
What is the minimum distance the flange on the hoist
drum should extend above the last wrap of rope? -
Answer-½ inch
Eccentric main boom tip reeving will - Answer-Twisting of
the boom
, 3|Page
What is the most common wire rope used on most
cranes? - Answer-Right regular lay
Prior to leveling a crane what should be done with the
outrigger jack? - Answer-Secure the float pad to jack
cylinder
What three functions will not work after two-blocking a
crane that has a prevention system? - Answer-Boom
down, extend the boom and hoist
Boom angle on a telescoping boom is measured from
above or below horizontal to the _________? - Answer-
Longitudinal axis of the boom base section
The line pull of the innermost layer on the hoist drum is
__________than the outermost layer. - Answer-Greater
Side loading of a crane can be caused by? - Answer-Wind
If power fails to the crane what must the operator ensure
is done? - Answer-The controls are put in the neutral
position
NCCCO LIFT DIRECTOR CERTIFICATION
EXAMINATION COMPLETE VERIFIED QUESTIONS
AND DETAILED SOLUTIONS LATEST UPDATE THIS
YEAR JUST RELEASED
Who is responsible for restricting unauthorized access to
the crane's work area? - Answer-Site Supervisor/Lift
Director
Who is responsible for ensuring the crane owner is notified
of any damage to the crane or replacement/repair of wire
rope? - Answer-Crane User
Who is responsible for ensuring crane operations are
stopped if alerted to an unsafe condition? - Answer-Lift
Director
If the operator or A/D determine that ground conditions are
not suitable for the equipment being operated, they should
request the _________ correct the issue - Answer-
Controlling Entity
,2|Page
Who is responsible for ensuring that personnel involved in
crane operations understand their responsibilities,
assigned duties and associated hazards? - Answer-Lift
Director
When can the operator of a crane set the crane up with
less than fully extended outriggers? - Answer-When the
load chart allows
The outrigger pad and cribbing should be strong enough
to support? - Answer-The total weight of the crane and the
load
What must be known prior to setting up your crane? -
Answer-Location of underground vaults
What is the minimum distance the flange on the hoist
drum should extend above the last wrap of rope? -
Answer-½ inch
Eccentric main boom tip reeving will - Answer-Twisting of
the boom
, 3|Page
What is the most common wire rope used on most
cranes? - Answer-Right regular lay
Prior to leveling a crane what should be done with the
outrigger jack? - Answer-Secure the float pad to jack
cylinder
What three functions will not work after two-blocking a
crane that has a prevention system? - Answer-Boom
down, extend the boom and hoist
Boom angle on a telescoping boom is measured from
above or below horizontal to the _________? - Answer-
Longitudinal axis of the boom base section
The line pull of the innermost layer on the hoist drum is
__________than the outermost layer. - Answer-Greater
Side loading of a crane can be caused by? - Answer-Wind
If power fails to the crane what must the operator ensure
is done? - Answer-The controls are put in the neutral
position