Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 5 pages
Exam (elaborations)

LEAN BRONZE CERTIFICATION ALL QUESTIONS AND ANSWERS SET A.pdf

Document preview thumbnail
Preview 2 out of 5 pages

LEAN BRONZE CERTIFICATION ALL QUESTIONS AND ANSWERS SET A.pdf

Content preview

LEAN BRONZE CERTIFICATION ALL QUESTIONS
AND ANSWERS SET A+
✔✔Value stream lead time is comprised of cycle time and: - ✔✔retention time

✔✔PDCA refers to: - ✔✔Plan, do, check, act

✔✔Long set ups Most likely will: - ✔✔decrease flexibility

✔✔Pull systems are a good way to - ✔✔connect and synchronized pieces. of the value
stream

✔✔A goal of a lean production is to be good enough to: - ✔✔produce every part,
everyday

✔✔An operator balance chart is associated with: - ✔✔Standardized work

✔✔Effective Suggestions programs: - ✔✔Encourage idea generation and reward team
member initiative

✔✔Total Quality Control (TQC) is an integrated effort aimed to: - ✔✔driving continuous
improvements at all levels

✔✔The BEST way to describe a "root cause" solution is: - ✔✔A solution that will
prevent problem from recurring

✔✔Which of the following is the best description of the foundation of a good lean
system? - ✔✔Stability and standardization

✔✔Problem solving in a lean company has the following common themes; -
✔✔collecting, analyzing, and verifying data

, ✔✔When supplier lead - times are long: - ✔✔Is it still possible to set-up pull systems

✔✔Which of the following is the BEST definition of perfection? - ✔✔the complete
elimination of waste so that all activities along a value stream create value

✔✔The key focus of the Toyota Production System is to improve: - ✔✔quality, cost and
delivery

✔✔Value is defined by: - ✔✔the customer

✔✔Which of these metrics often serve as KEY performance measures in a "standard
cost" accounting system? - ✔✔machine and employee utilization

✔✔A Value Stream Map Depicits: - ✔✔material and information flow

✔✔In a 5S program, a shadow board for tools is an example of: - ✔✔setting in order

✔✔Lean practitioners focus on discovering the root cause by: - ✔✔asking why 5 times

✔✔One of the components of the takt time calculation is: - ✔✔average quantity
demanded by customer

✔✔A batch - an queue system is typically a/an: - ✔✔push system

✔✔Which of the following would you LEAST expect in successful lean implementation?
- ✔✔decreases in cash flow

✔✔Which of the following is considered non-value added activity? - ✔✔de-burring parts
received from a supplier

✔✔Lean attempts to match: - ✔✔pace of production to pace of sales

✔✔JIT production requires: - ✔✔good process flow

✔✔Work cells are generally set up: - ✔✔in a layout that reflects production steps

✔✔In a lean factory, which of the following would you expect to see? - ✔✔lowest level
possible decision making

✔✔Kanban (pull signal) that specifies the kind and quantity of product that the
downstream process may pull out is known as - ✔✔withdrawal kanban

Document information

Uploaded on
August 8, 2026
Number of pages
5
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$18.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
1
Followers
2
Items
2211
Last sold
1 week ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions