VA Advanced Class A Contractor Exam Actual Exam – Higher Education and Professional Curriculum – 2026/2027 Academic Year – Verified Questions and Answers for Advanced Construction and Contracting Professionals

Document preview thumbnail
Preview 2 out of 8 pages

This document contains verified questions and answers for the VA Advanced Class A Contractor Exam for the 2026/2027 academic year. It covers advanced construction and contracting concepts, including project management, construction practices, estimating and bidding, contracts, building codes, workplace safety, business and financial management, and regulatory compliance. The material is designed to reinforce professional contracting knowledge and support preparation for Virginia Class A contractor licensing assessments.

Content preview

VA ADVANCED CLASS A CONTRACTOR
EXAM ACTUAL EXAM 2026/2027 |
Verified Questions
Higher Education and Professional Curriculum | Verified Q&A |
Advanced Construction and Contracting Professionals

Introduction
This 2026/2027 VA Advanced Class A Contractor Exam set contains exactly 24 original questions,
matching the official 24-item Advanced Portion blueprint for the Class A contractor examination. The
questions cover the official advanced domains of Estimating and Bidding, Contract Management, Project
Management, Risk Management, Safety, Labor Laws, Financial Management, Federal and State Taxes,
and Lien Laws. This original content is designed to reinforce official Virginia Department of Professional
and Occupational Regulation (DPOR) Class A contractor certification objectives for actual exam readiness
and advanced professional proficiency. The accompanying rationales draw on official Virginia licensing
materials, foundational construction management texts, and current evidence-based construction,
financial, and safety guidance across the full 24-question assessment.

Actual Questions
Domain: Estimating and Bidding
1. Before submitting a lump-sum bid, an estimator discovers that the earthwork quantity in
an early takeoff conflicts with the latest issued drawings. Which action is most defensible?
A. Ignore the revised drawings because the early takeoff was completed first.
B. Use the lower quantity without recording the difference.
C. Reconcile the current contract documents, quantify the affected scope, and state necessary assumptions
or clarifications in the bid.
D. Remove all earthwork from the estimate until after award.
Correct Answer: C
Rationale: A responsible estimate is based on the current contract documents. Reconciling the discrepancy and
documenting assumptions reduces the risk of an unpriced scope gap or unsupported contingency.
Domain: Contract Management
2. Plans and specifications appear to conflict on a material requirement. What should the
contractor do before proceeding with the affected work?
A. Select the less expensive interpretation without notifying anyone.
B. Follow the contract's order of precedence and seek formal written clarification through the contract
process.
C. Permanently disregard the specifications because drawings are easier to read.
D. Allow an individual craft worker to decide which document controls.
Correct Answer: B
Rationale: Contract documents commonly establish an order of precedence and a formal clarification process.
Using both protects the parties from unauthorized interpretation and avoids work that may later be rejected.




VA ADVANCED CLASS A CONTRACTOR EXAM ACTUAL EXAM 2026/2027 | Verified Questions

, 3. An owner gives a verbal direction that changes the scope and is likely to affect cost and
schedule. Which step best protects the contractor's contractual position?
A. Perform the change immediately and rely on memory for later pricing.
B. Invoice an arbitrary amount at closeout.
C. Treat the direction as a waiver of all contract requirements.
D. Document the scope, cost, and time impact and obtain written change authorization unless the
contract's emergency procedure applies.
Correct Answer: D
Rationale: Written change control establishes the authorized scope and its price and time consequences,
creating a reliable record before changed work is performed when the contract permits.
4. A subcontract requires both indemnification and commercial general liability
insurance. Which statement best describes their relationship?
A. Insurance automatically eliminates every contractual indemnity obligation.
B. Indemnification allocates contractual responsibility for specified losses, while insurance may fund
covered losses subject to its policy terms.
C. Indemnification and insurance are identical clauses with identical effects.
D. Neither indemnification nor insurance should be reviewed before signing a subcontract.
Correct Answer: B
Rationale: Indemnity provisions allocate risk by contract, while insurance is a separate risk-financing
mechanism governed by policy coverage, limits, exclusions, and conditions.
5. A subcontractor is missing a critical milestone and may be in default. What is the
contractor's most appropriate initial contractual response?
A. Withhold all communication until final payment is due.
B. Terminate the subcontractor orally without reviewing the subcontract.
C. Provide contract-compliant written notice describing the default and follow the required cure or
termination process while documenting facts.
D. Allow the missed milestone to revise the contract automatically.
Correct Answer: C
Rationale: Default remedies depend on the subcontract's notice, cure, and termination provisions. Timely
written notice and accurate documentation preserve the contractor's ability to use those remedies
appropriately.
Domain: Project Management
6. Which sequence of activities determines the shortest possible completion date for a
project because delay to any activity in the sequence delays the project?
A. The resource histogram
B. The procurement log
C. The quality-control checklist
D. The critical path
Correct Answer: D
Rationale: The critical path is the chain of dependent activities with no total float that establishes the minimum
project duration under the current schedule logic.
Domain: Risk Management
7. What is the best use of a project risk register during construction planning?
A. Record identified risks, assess likelihood and impact, assign an owner, and document response actions.
B. Replace the contract documents with a single list of concerns.
C. Track only risks that have already occurred.
D. Eliminate all contingency planning after notice to proceed.
Correct Answer: A
Rationale: A risk register makes risks visible and actionable by documenting their evaluation, ownership, and
planned response before they become unmanaged project issues.


VA ADVANCED CLASS A CONTRACTOR EXAM ACTUAL EXAM 2026/2027 | Verified Questions

Document information

Uploaded on
August 8, 2026
Number of pages
8
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$15.00

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BestSellerStuvia
3.6
(675)
Sold
4782
Followers
2078
Items
6167
Last sold
1 hour ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions