CIIP ALL SET QUESTIONS AND ANSWERS SET A+
✔✔The Procurement process includes three general steps. They are:
Need, Selection, and Purchase
Need, Selection, and Contract
Need, Selection, and Negotiation
Need, Selection, and Analysis - ✔✔Need, Selection, and Negotiation
✔✔Key readiness factors to consider when preparing for a new IT system do not
include which of the following?
Network infrastructure
Out-sourced IT support for RIS or PACS
Physical readiness
Implementation policies - ✔✔Implementation policies
✔✔Needs Analysis is a tool that is used to determine:
Assessment questionnaires
Vendor needs
The present condition of the institution
Film needs - ✔✔The present condition of the institution
✔✔The key person leading a PACS implementation process is called:
Steering committee
PACS Administrator
Project Champion
Chief Radiologist - ✔✔Project champion
✔✔Typical contract components do not include which of the following?
Acceptance testing plan
RFQ
Architectural drawings
Warranty information - ✔✔RFQ
,✔✔When preparing a formal strategic plan, which of the following would be considered?
HIS
RIS
PACS
Internal Organizational Analysis - ✔✔Internal Organizational Analysis
✔✔The security aspect of a facility readiness is referring to:
VPN
Reading rooms
DICOM worklist
VLANs - ✔✔VPN (virtual private network)
✔✔The concept of project management was started for the following purpose:
development of hospitals
management of complex weapon systems
business idea for information technology
A guideline for project development in all business areas - ✔✔management of complex
weapon systems
✔✔What is the purpose of a Work Breakdown Structure?
breaks a project down into its various components
formalized way of reducing the project to lower levels of greater detail
helps to identify activities and assign responsibility
all of the above - ✔✔All of the above
✔✔Which of the knowledge areas of Project Management would fall into the category of
Project Scope?
incorporation of groups
essential and distinguishable attributes
state of the environment in which a situation exists
incorporation of groups into a whole - ✔✔state of the environment in which a situation
exists
✔✔Which of the knowledge areas would be categorized with Project Quality?
incorporation of groups into a whole
transmission of information from one location to another
loss or injury
essential attribute or grade of excellence - ✔✔essential attribute or grade of excellence
✔✔The study of the differences between two different systems or processes is called: a.
GAP analysisb. PACS workflowc. PACS outcome
d. PACS Implementation - ✔✔GAP analysis
, ✔✔A bar chart that shows interrelationships of how projects, schedules, and other time
related systems progress over time is referred to as: a. Indented WBS b. Graphical
WBS
c. SMART goals d. GANTT Chart - ✔✔d. GANTT Chart
✔✔A statement of work that answers questions about the scope and purpose of the
project as well as the deliverables and chain of command would be called:
Activities of the project
Stakeholder groups
Responsibility Matrix
Code Matrix - ✔✔Responsibility Matrix
✔✔One of the most common mistakes made in planning a project is adding work little
by little until the project has become unachievable. This is called:
Scope Statement
Purpose statement
Scope Creep
Statement Of Work - ✔✔Scope creep
✔✔Project risk includes which of the following:
Top management commitment
Roll-back plan
Sound infrastructure
Cost over-run - ✔✔Cost over run
✔✔PERT stands for:
Program Experience and Review Timing
Program Evaluation and Review Technique
Program Expert and Required Timing
Program Evaluation and Registered Tech - ✔✔Program Evaluation and Review
Technique
✔✔As a part of Project Quality, one would do which of the following:
Systematic testing
Peer reviews
None of the above
Both of the above - ✔✔Both
✔✔When conducting a Needs Assessment, one should do all of the following except:
Rank goals
Define the job
Determine negative areas
Set priorities for action - ✔✔Determine negative areas
✔✔The Procurement process includes three general steps. They are:
Need, Selection, and Purchase
Need, Selection, and Contract
Need, Selection, and Negotiation
Need, Selection, and Analysis - ✔✔Need, Selection, and Negotiation
✔✔Key readiness factors to consider when preparing for a new IT system do not
include which of the following?
Network infrastructure
Out-sourced IT support for RIS or PACS
Physical readiness
Implementation policies - ✔✔Implementation policies
✔✔Needs Analysis is a tool that is used to determine:
Assessment questionnaires
Vendor needs
The present condition of the institution
Film needs - ✔✔The present condition of the institution
✔✔The key person leading a PACS implementation process is called:
Steering committee
PACS Administrator
Project Champion
Chief Radiologist - ✔✔Project champion
✔✔Typical contract components do not include which of the following?
Acceptance testing plan
RFQ
Architectural drawings
Warranty information - ✔✔RFQ
,✔✔When preparing a formal strategic plan, which of the following would be considered?
HIS
RIS
PACS
Internal Organizational Analysis - ✔✔Internal Organizational Analysis
✔✔The security aspect of a facility readiness is referring to:
VPN
Reading rooms
DICOM worklist
VLANs - ✔✔VPN (virtual private network)
✔✔The concept of project management was started for the following purpose:
development of hospitals
management of complex weapon systems
business idea for information technology
A guideline for project development in all business areas - ✔✔management of complex
weapon systems
✔✔What is the purpose of a Work Breakdown Structure?
breaks a project down into its various components
formalized way of reducing the project to lower levels of greater detail
helps to identify activities and assign responsibility
all of the above - ✔✔All of the above
✔✔Which of the knowledge areas of Project Management would fall into the category of
Project Scope?
incorporation of groups
essential and distinguishable attributes
state of the environment in which a situation exists
incorporation of groups into a whole - ✔✔state of the environment in which a situation
exists
✔✔Which of the knowledge areas would be categorized with Project Quality?
incorporation of groups into a whole
transmission of information from one location to another
loss or injury
essential attribute or grade of excellence - ✔✔essential attribute or grade of excellence
✔✔The study of the differences between two different systems or processes is called: a.
GAP analysisb. PACS workflowc. PACS outcome
d. PACS Implementation - ✔✔GAP analysis
, ✔✔A bar chart that shows interrelationships of how projects, schedules, and other time
related systems progress over time is referred to as: a. Indented WBS b. Graphical
WBS
c. SMART goals d. GANTT Chart - ✔✔d. GANTT Chart
✔✔A statement of work that answers questions about the scope and purpose of the
project as well as the deliverables and chain of command would be called:
Activities of the project
Stakeholder groups
Responsibility Matrix
Code Matrix - ✔✔Responsibility Matrix
✔✔One of the most common mistakes made in planning a project is adding work little
by little until the project has become unachievable. This is called:
Scope Statement
Purpose statement
Scope Creep
Statement Of Work - ✔✔Scope creep
✔✔Project risk includes which of the following:
Top management commitment
Roll-back plan
Sound infrastructure
Cost over-run - ✔✔Cost over run
✔✔PERT stands for:
Program Experience and Review Timing
Program Evaluation and Review Technique
Program Expert and Required Timing
Program Evaluation and Registered Tech - ✔✔Program Evaluation and Review
Technique
✔✔As a part of Project Quality, one would do which of the following:
Systematic testing
Peer reviews
None of the above
Both of the above - ✔✔Both
✔✔When conducting a Needs Assessment, one should do all of the following except:
Rank goals
Define the job
Determine negative areas
Set priorities for action - ✔✔Determine negative areas