Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 27 pages
Exam (elaborations)

CIIP ALL SET QUESTIONS AND ANSWERS SET A.pdf

Document preview thumbnail
Preview 3 out of 27 pages

CIIP ALL SET QUESTIONS AND ANSWERS SET A.pdf

Content preview

CIIP ALL SET QUESTIONS AND ANSWERS SET A+
✔✔The Procurement process includes three general steps. They are:
Need, Selection, and Purchase
Need, Selection, and Contract
Need, Selection, and Negotiation
Need, Selection, and Analysis - ✔✔Need, Selection, and Negotiation

✔✔Key readiness factors to consider when preparing for a new IT system do not
include which of the following?
Network infrastructure
Out-sourced IT support for RIS or PACS
Physical readiness
Implementation policies - ✔✔Implementation policies

✔✔Needs Analysis is a tool that is used to determine:
Assessment questionnaires
Vendor needs
The present condition of the institution
Film needs - ✔✔The present condition of the institution

✔✔The key person leading a PACS implementation process is called:
Steering committee
PACS Administrator
Project Champion
Chief Radiologist - ✔✔Project champion

✔✔Typical contract components do not include which of the following?
Acceptance testing plan
RFQ
Architectural drawings
Warranty information - ✔✔RFQ

,✔✔When preparing a formal strategic plan, which of the following would be considered?
HIS
RIS
PACS
Internal Organizational Analysis - ✔✔Internal Organizational Analysis

✔✔The security aspect of a facility readiness is referring to:
VPN
Reading rooms
DICOM worklist
VLANs - ✔✔VPN (virtual private network)

✔✔The concept of project management was started for the following purpose:
development of hospitals
management of complex weapon systems
business idea for information technology
A guideline for project development in all business areas - ✔✔management of complex
weapon systems

✔✔What is the purpose of a Work Breakdown Structure?
breaks a project down into its various components
formalized way of reducing the project to lower levels of greater detail
helps to identify activities and assign responsibility
all of the above - ✔✔All of the above

✔✔Which of the knowledge areas of Project Management would fall into the category of
Project Scope?
incorporation of groups
essential and distinguishable attributes
state of the environment in which a situation exists
incorporation of groups into a whole - ✔✔state of the environment in which a situation
exists

✔✔Which of the knowledge areas would be categorized with Project Quality?
incorporation of groups into a whole
transmission of information from one location to another
loss or injury
essential attribute or grade of excellence - ✔✔essential attribute or grade of excellence

✔✔The study of the differences between two different systems or processes is called: a.
GAP analysisb. PACS workflowc. PACS outcome
d. PACS Implementation - ✔✔GAP analysis

, ✔✔A bar chart that shows interrelationships of how projects, schedules, and other time
related systems progress over time is referred to as: a. Indented WBS b. Graphical
WBS
c. SMART goals d. GANTT Chart - ✔✔d. GANTT Chart

✔✔A statement of work that answers questions about the scope and purpose of the
project as well as the deliverables and chain of command would be called:
Activities of the project
Stakeholder groups
Responsibility Matrix
Code Matrix - ✔✔Responsibility Matrix

✔✔One of the most common mistakes made in planning a project is adding work little
by little until the project has become unachievable. This is called:
Scope Statement
Purpose statement
Scope Creep
Statement Of Work - ✔✔Scope creep

✔✔Project risk includes which of the following:
Top management commitment
Roll-back plan
Sound infrastructure
Cost over-run - ✔✔Cost over run

✔✔PERT stands for:
Program Experience and Review Timing
Program Evaluation and Review Technique
Program Expert and Required Timing
Program Evaluation and Registered Tech - ✔✔Program Evaluation and Review
Technique

✔✔As a part of Project Quality, one would do which of the following:
Systematic testing
Peer reviews
None of the above
Both of the above - ✔✔Both

✔✔When conducting a Needs Assessment, one should do all of the following except:
Rank goals
Define the job
Determine negative areas
Set priorities for action - ✔✔Determine negative areas

Document information

Uploaded on
August 6, 2026
Number of pages
27
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$19.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
1
Followers
2
Items
2007
Last sold
1 week ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions