Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 82 pages
Exam (elaborations)

NEVADA C-5 CONCRETE CONTRACTOR EXAM BANK | 200 PRACTICE QUESTIONS AND ANSWERS | EXPERT VERIFIED RATIONALES

Document preview thumbnail
Preview 4 out of 82 pages

NEVADA C-5 CONCRETE CONTRACTOR EXAM BANK | 200 PRACTICE QUESTIONS AND ANSWERS | EXPERT VERIFIED RATIONALES Q1. What is the total number of scored questions on the Nevada C-5 Concrete Contractor exam administered by PSI? A. 80 B. 50 C. 60 D. 100 Correct: C Rationale: The PSI-administered exam consists of 60 scored multiple-choice questions. An additional 5–10 unscored pretest items may also be included but do not affect the candidate's score. ________________________________________ Q2. What is the time limit to complete the Nevada C-5 Concrete Contractor exam? A. 3 hours B. 1.5 hours C. 2 hours D. 4 hours Correct: C Rationale: Candidates have 2 hours (120 minutes) to complete the 60 scored questions. ________________________________________ Q3. What is the minimum passing score required for the Nevada C-5 Concrete Contractor exam? A. 60% B. 75% C. 80% D. 70% Correct: D Rationale: A minimum of 42 correct answers out of 60 scored questions (70%) is required to pass the exam. ________________________________________ Q4. Is the Nevada C-5 Concrete Contractor exam open-book or closed-book? A. Closed-book B. Open-book C. Combination of both D. Depends on the testing location Correct: B Rationale: The exam is open-book. Candidates may use approved reference materials during the test. ________________________________________ Q5. Which agency administers the Nevada C-5 Concrete Contractor license exam? A. Nevada State Contractors Board (NSCB) B. Occupational Safety and Health Administration (OSHA) C. American Concrete Institute (ACI) D. International Code Council (ICC) Correct: A Rationale: The Nevada C-5 Concrete Contractor License Exam is administered by PSI Services LLC on behalf of the Nevada State Contractors Board (NSCB). ________________________________________ Q6. According to NAC 624.230, a person who holds a classification C-5 license may prepare the surface and place which of the following? A. Asphalt paving B. Concrete C. Masonry units D. Structural steel Correct: B Rationale: The C-5 Concrete Contracting license authorizes the preparation of surfaces and placement of concrete within the scope defined by Nevada regulations. ________________________________________ Q7. Which of the following is NOT within the scope of work for a C-5 Concrete Contractor in Nevada? A. Placing concrete foundations B. Installing reinforcing steel C. Constructing formwork D. Installing electrical conduit in concrete Correct: D Rationale: While C-5 contractors place concrete and install reinforcement and formwork, electrical work falls under separate trade classifications and is not within the C-5 scope. ________________________________________ Q8. What is the minimum compressive strength (f'c) required for standard residential concrete foundation walls according to the IBC? A. 2,000 psi B. 3,000 psi C. 3,500 psi D. 2,500 psi Correct: D Rationale: IBC Section 1905.1 requires a minimum compressive strength of 2,500 psi for cast-in-place concrete foundation walls in residential construction. ________________________________________ Q9. What is the maximum allowable water-cement ratio for concrete exposed to freezing and thawing in a severe climate such as northern Nevada? A. 0.35 B. 0.50 C. 0.40 D. 0.45

Content preview

NEVADA C-5 CONCRETE CONTRACTOR EXAM BANK | 200 PRACTICE
QUESTIONS AND ANSWERS | EXPERT VERIFIED RATIONALES




Q1. What is the total number of scored questions on the Nevada C-5
Concrete Contractor exam administered by PSI?
A. 80
B. 50
C. 60
D. 100
Correct: C
Rationale: The PSI-administered exam consists of 60 scored multiple-
choice questions. An additional 5–10 unscored pretest items may also
be included but do not affect the candidate's score.


Q2. What is the time limit to complete the Nevada C-5 Concrete
Contractor exam?
A. 3 hours
B. 1.5 hours
C. 2 hours
D. 4 hours
Correct: C
Rationale: Candidates have 2 hours (120 minutes) to complete the 60
scored questions.

,Q3. What is the minimum passing score required for the Nevada C-5
Concrete Contractor exam?
A. 60%
B. 75%
C. 80%
D. 70%
Correct: D
Rationale: A minimum of 42 correct answers out of 60 scored questions
(70%) is required to pass the exam.


Q4. Is the Nevada C-5 Concrete Contractor exam open-book or closed-
book?
A. Closed-book
B. Open-book
C. Combination of both
D. Depends on the testing location
Correct: B
Rationale: The exam is open-book. Candidates may use approved
reference materials during the test.


Q5. Which agency administers the Nevada C-5 Concrete Contractor
license exam?

,A. Nevada State Contractors Board (NSCB)
B. Occupational Safety and Health Administration (OSHA)
C. American Concrete Institute (ACI)
D. International Code Council (ICC)
Correct: A
Rationale: The Nevada C-5 Concrete Contractor License Exam is
administered by PSI Services LLC on behalf of the Nevada State
Contractors Board (NSCB).


Q6. According to NAC 624.230, a person who holds a classification C-5
license may prepare the surface and place which of the following?
A. Asphalt paving
B. Concrete
C. Masonry units
D. Structural steel
Correct: B
Rationale: The C-5 Concrete Contracting license authorizes the
preparation of surfaces and placement of concrete within the scope
defined by Nevada regulations.


Q7. Which of the following is NOT within the scope of work for a C-5
Concrete Contractor in Nevada?
A. Placing concrete foundations
B. Installing reinforcing steel

, C. Constructing formwork
D. Installing electrical conduit in concrete
Correct: D
Rationale: While C-5 contractors place concrete and install
reinforcement and formwork, electrical work falls under separate trade
classifications and is not within the C-5 scope.


Q8. What is the minimum compressive strength (f'c) required for
standard residential concrete foundation walls according to the IBC?
A. 2,000 psi
B. 3,000 psi
C. 3,500 psi
D. 2,500 psi
Correct: D
Rationale: IBC Section 1905.1 requires a minimum compressive strength
of 2,500 psi for cast-in-place concrete foundation walls in residential
construction.


Q9. What is the maximum allowable water-cement ratio for concrete
exposed to freezing and thawing in a severe climate such as northern
Nevada?
A. 0.35
B. 0.50
C. 0.40
D. 0.45

Document information

Uploaded on
August 6, 2026
Number of pages
82
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$15.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
IszackBd
5.0
(3)
Sold
46
Followers
3
Items
5862
Last sold
2 days ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions