CA D-64 NON-SPECIALIZED CONTRACTOR
EXAMINATION COMPLETE QUESTIONS AND
DETAILED SOLUTIONS LATEST UPDATE THIS YEAR
JUST RELEASED
Coverage Areas
1. D-64 Classification and Scope — Understanding what “non-specialized” work means and when D-64 can
be assigned.
2. Classification Boundaries — Recognizing when work belongs under an existing A, B, or C specialty
classification instead.
3. California Contractor Licensing Law — Licensing requirements, qualifying individuals, classifications, and
lawful contracting.
4. Contracts and Documentation — Written agreements, change orders, payment terms, project records,
and consumer protections.
5. Business Organization and Management — Business structures, recordkeeping, supervision, and
operational responsibilities.
6. Estimating and Bidding — Labor, materials, overhead, markup, contingencies, and accurate project
pricing.
7. Employment and Workers’ Compensation — Employee classification, payroll responsibilities, workers’
compensation, and workplace obligations.
8. Construction Safety and Jobsite Practices — PPE, hazard recognition, housekeeping, equipment safety,
and accident prevention.
9. Project Administration and Quality Control — Scheduling, inspections, materials, workmanship,
documentation, and resolving deficiencies.
10. Financial, Legal, and Regulatory Compliance — Bonds, insurance, payments, liens, advertising,
complaints, and CSLB enforcement.
CA D-64 Non-specialized Contractor
1.
Which statement most accurately describes the California D-64 Non-specialized
Contractor classification under CSLB regulations?
A. It authorizes every type of construction work without limitation.
B. It covers work that is not defined within another recognized classification.
,C. It is exclusively limited to residential remodeling projects.
D. It automatically includes electrical, plumbing, and HVAC contracting.
Answer: B
Rationale: CSLB defines D-64 as covering installation, modification, maintenance,
removal, and repair of new products or installations that are not defined within
another recognized classification. (
2.
Why does CSLB restrict D-64 work to activities outside already recognized
contractor classifications?
A. To eliminate all specialty contractors from California construction projects.
B. To prevent contractors from avoiding requirements associated with established
classifications.
C. To allow D-64 contractors to perform unlimited general engineering work.
D. To require every contractor to obtain multiple classifications simultaneously.
Answer: B
Rationale: D-64 is a residual classification for qualifying work that does not fit an
existing classification; it is not intended to bypass established classification
boundaries. (web.cslb.ca.gov)
3.
A contractor proposes work clearly covered by an existing specialty
classification rather than D-64; what should happen?
A. D-64 should automatically override the existing classification.
B. The contractor should perform the work without obtaining any license.
C. CSLB should assign the appropriate recognized classification instead.
D. The contractor should simply describe the work as miscellaneous construction.
,Answer: C
Rationale: CSLB explains that when work falls within an existing primary or
specialty classification, CSLB will assign that classification rather than D-64.
(web.cslb.ca.gov)
4.
Which CSLB classification category contains the D-64 Non-specialized
designation for licensing purposes?
A. A General Engineering
B. B General Building
C. C-61 Limited Specialty
D. C-10 Electrical
Answer: C
Rationale: D-64 is one of the administrative subcategories associated with the C-
61 Limited Specialty classification. (web.cslb.ca.gov)
5.
What is the primary reason a contractor should carefully determine
classification before accepting unfamiliar construction work?
A. Classification determines whether the contractor is legally authorized to
perform the work.
B. Classification determines whether workers can receive vacation benefits.
C. Classification eliminates the need for written construction contracts.
D. Classification guarantees that every project will produce profit.
Answer: A
, Rationale: Contractor classifications establish the authorized scope of contracting
activities, making classification compliance essential before undertaking work.
6.
Which situation presents the greatest classification concern for a contractor
holding D-64 authorization?
A. Performing work specifically determined to fall outside existing classifications.
B. Performing work previously approved by CSLB under the contractor's scope.
C. Performing work clearly regulated under another established specialty
classification.
D. Maintaining accurate project records for completed non-specialized projects.
Answer: C
Rationale: D-64 is not intended to replace a classification that already specifically
covers the proposed work. (cslb.ca.gov)
7.
What should a contractor do when uncertain whether proposed work belongs
under D-64 or another classification?
A. Begin work immediately and determine classification afterward.
B. Seek clarification from CSLB before undertaking potentially unauthorized work.
C. Advertise the work under whichever classification appears most profitable.
D. Ask the customer to determine which classification applies.
Answer: B
Rationale: Classification is a licensing matter governed by CSLB, so uncertainty
should be resolved before contracting or performing questionable work.
EXAMINATION COMPLETE QUESTIONS AND
DETAILED SOLUTIONS LATEST UPDATE THIS YEAR
JUST RELEASED
Coverage Areas
1. D-64 Classification and Scope — Understanding what “non-specialized” work means and when D-64 can
be assigned.
2. Classification Boundaries — Recognizing when work belongs under an existing A, B, or C specialty
classification instead.
3. California Contractor Licensing Law — Licensing requirements, qualifying individuals, classifications, and
lawful contracting.
4. Contracts and Documentation — Written agreements, change orders, payment terms, project records,
and consumer protections.
5. Business Organization and Management — Business structures, recordkeeping, supervision, and
operational responsibilities.
6. Estimating and Bidding — Labor, materials, overhead, markup, contingencies, and accurate project
pricing.
7. Employment and Workers’ Compensation — Employee classification, payroll responsibilities, workers’
compensation, and workplace obligations.
8. Construction Safety and Jobsite Practices — PPE, hazard recognition, housekeeping, equipment safety,
and accident prevention.
9. Project Administration and Quality Control — Scheduling, inspections, materials, workmanship,
documentation, and resolving deficiencies.
10. Financial, Legal, and Regulatory Compliance — Bonds, insurance, payments, liens, advertising,
complaints, and CSLB enforcement.
CA D-64 Non-specialized Contractor
1.
Which statement most accurately describes the California D-64 Non-specialized
Contractor classification under CSLB regulations?
A. It authorizes every type of construction work without limitation.
B. It covers work that is not defined within another recognized classification.
,C. It is exclusively limited to residential remodeling projects.
D. It automatically includes electrical, plumbing, and HVAC contracting.
Answer: B
Rationale: CSLB defines D-64 as covering installation, modification, maintenance,
removal, and repair of new products or installations that are not defined within
another recognized classification. (
2.
Why does CSLB restrict D-64 work to activities outside already recognized
contractor classifications?
A. To eliminate all specialty contractors from California construction projects.
B. To prevent contractors from avoiding requirements associated with established
classifications.
C. To allow D-64 contractors to perform unlimited general engineering work.
D. To require every contractor to obtain multiple classifications simultaneously.
Answer: B
Rationale: D-64 is a residual classification for qualifying work that does not fit an
existing classification; it is not intended to bypass established classification
boundaries. (web.cslb.ca.gov)
3.
A contractor proposes work clearly covered by an existing specialty
classification rather than D-64; what should happen?
A. D-64 should automatically override the existing classification.
B. The contractor should perform the work without obtaining any license.
C. CSLB should assign the appropriate recognized classification instead.
D. The contractor should simply describe the work as miscellaneous construction.
,Answer: C
Rationale: CSLB explains that when work falls within an existing primary or
specialty classification, CSLB will assign that classification rather than D-64.
(web.cslb.ca.gov)
4.
Which CSLB classification category contains the D-64 Non-specialized
designation for licensing purposes?
A. A General Engineering
B. B General Building
C. C-61 Limited Specialty
D. C-10 Electrical
Answer: C
Rationale: D-64 is one of the administrative subcategories associated with the C-
61 Limited Specialty classification. (web.cslb.ca.gov)
5.
What is the primary reason a contractor should carefully determine
classification before accepting unfamiliar construction work?
A. Classification determines whether the contractor is legally authorized to
perform the work.
B. Classification determines whether workers can receive vacation benefits.
C. Classification eliminates the need for written construction contracts.
D. Classification guarantees that every project will produce profit.
Answer: A
, Rationale: Contractor classifications establish the authorized scope of contracting
activities, making classification compliance essential before undertaking work.
6.
Which situation presents the greatest classification concern for a contractor
holding D-64 authorization?
A. Performing work specifically determined to fall outside existing classifications.
B. Performing work previously approved by CSLB under the contractor's scope.
C. Performing work clearly regulated under another established specialty
classification.
D. Maintaining accurate project records for completed non-specialized projects.
Answer: C
Rationale: D-64 is not intended to replace a classification that already specifically
covers the proposed work. (cslb.ca.gov)
7.
What should a contractor do when uncertain whether proposed work belongs
under D-64 or another classification?
A. Begin work immediately and determine classification afterward.
B. Seek clarification from CSLB before undertaking potentially unauthorized work.
C. Advertise the work under whichever classification appears most profitable.
D. Ask the customer to determine which classification applies.
Answer: B
Rationale: Classification is a licensing matter governed by CSLB, so uncertainty
should be resolved before contracting or performing questionable work.